Baltimore City · 21207

1917 N FOREST PARK AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$191,033
Land use
Residential (R)
Year built
1910
Last sale
Nov 18, 2025

Assessment

OwnerOGUNDIPE, FEMI SAMUEL
Land useResidential (R)
Total assessment$191,033 (cycle 2026)
Last saleNov 18, 2025 — $180,000
Year built1910
ZoningR-5
Vacant

Permits

5
TypeDescriptionCostIssued
BRCMScope of Work – Basement Concrete Removal, New Pour & French Drain Installation Project Address: 1917 N Forest Park Ave   Area: 25' × 23' (575 sq ft) --- 1. Demolition & Removal • Break and remove the existing concrete slab in the basement (full 25' × 23' area). • Saw?cut edges as needed for clean perimeter lines. • Remove all concrete debris and haul away off?site. • Clean and prepare the sub?base for drainage and new concrete installation. --- 2. French Drain Installation • Excavate trench along the interior perimeter of the basement. • Install perforated drain pipe with proper slope toward sump pump or discharge point. • Add washed gravel/stone bedding around the pipe. • Install filter fabric to prevent soil intrusion. • Connect to existing sump pump system (or prepare connection point if needed). • Backfill and compact trench area in preparation for new concrete. --- 3. Site Preparation for New Concrete • Compact and level the entire sub?base. • Install vapor barrier (if required). • Install reinforcement (wire mesh or rebar) for slab stability. • Form edges and transitions to existing walls and footings. --- 4. New Concrete Slab Installation • Supply and pour new concrete slab over the full 575 sq ft area. • Concrete mix: 3,000–3,500 PSI (or per code requirement). • Screed, float, and finish to a smooth trowel finish. • Ensure proper slab thickness (typically 4"). • Apply curing compound and allow proper curing time. --- 5. Cleanup • Remove all debris, concrete waste, and excess materials from the property. • Final cleanup of the basement work area. • Leave the site clean and ready for the next phase. DECK – New Wood Deck Construction Project Address: 1917 N Forest Park Ave   Deck Size: 15 ft × 10 ft (150 sq ft)   Location: Rear of the property --- 1. Site Preparation • Inspect and mark the designated 15' × 10' deck area. • Remove vegetation, debris, or obstacles as needed. • Level and prepare the ground for footings and framing. • Confirm layout and elevation with homeowner before construction. --- 2. Footings & Structural Support • Install concrete footings per code requirements for load?bearing support. • Set pressure?treated 4×4 or 6×6 posts (as required by design). • Ensure posts are plumb, level, and properly anchored. --- 3. Framing • Install pressure?treated lumber for the deck frame (joists, beams, rim boards). • Joist spacing per code (typically 16" on center). • Install hardware, joist hangers, and structural connectors as required. • Ensure frame is square, level, and structurally sound. --- 4. Decking Installation • Install pressure?treated deck boards or selected decking material. • Fasten boards with exterior?grade screws for durability. • Maintain consistent spacing for drainage and expansion. • Trim edges for a clean, finished appearance. --- 5. Railing System (If Required) • Install code?compliant railing around exposed sides of the deck. • Use pressure?treated posts, rails, and balusters. • Ensure railing height and spacing meet local building codes. --- 6. Finishing • Sand rough edges as needed. • Clean work area and remove all construction debris. • Deck is left ready for stain or seal (staining not included unless requested). SEPARATE PERMIT WILL BE REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING WORK. AS PER PLANS AND AS PER CODE.$5,000May 22, 2026
BRCM* System #1 Install 2 tons AC system for basement and first floor. * System #2 Install 2 tons heat pump in attic Install supply and return ductwork Install 4 bath-room exhaust vent and 1 dryer vent$16,000Mar 11, 2026
BRCMELECTRIC - 30 CIRCUITS AND UPGRADE FROM 100 AMP TO 200 AMP SERVICE PLUMBING - RENOVATE 4 BATHROOMS, 1 KITCHEN, 1 LAUNDRY, DISHWASHER, ELECTRIC WATER HEATER$2,000Feb 5, 2026
BRCMLevel 3 interior renovation. New bathrooms. New kitchen. New finished basement.$90,000Jan 5, 2026
BRCMINTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS. REMOVAL OF ALL MECHANICAL ELETCTRICAL AND PLUMBING FIXTURES AND LINES. CLEAN UP AND REMOVAL OF DEBRIS VIA DUMPSTER.$10,000Jan 3, 2026

Violations

4
KindCategoryStatusFineBalanceDate
service_requestHCD-CCE Building Permit ComplaintClosedApr 28, 2026
service_requestHCD-Sanitation PropertyClosedJan 15, 2026
citationPM 305.5.1AO$50$50Jan 3, 2019
citationPM 305.5.2P$50$0Nov 8, 2018

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.