Baltimore City · 21229

606 WINANS WAY

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$252,100
Land use
Residential (R)
Year built
1950
Last sale
Oct 15, 2021

Assessment

OwnerMIDDLETON, DANA M
Land useResidential (R)
Total assessment$252,100 (cycle 2026)
Last saleOct 15, 2021 — $250,000
Year built1950
ZoningR-1
Vacant

Permits

8
TypeDescriptionCostIssued
COM2022INSTALL (8) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.$1,200Jan 5, 2023
COM2022REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-76829:INSTALL (2) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 60000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2021-76829) INSTALL (2) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 60000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.Jun 30, 2022
COM2022 Extend Original Permit.(original permit:COM2021-69592:AS PER CHAP: ON FAÇADE, INSTALL FIVE WOODEN SHUTTERS THAT MATCH EXISTING IN DIMENSIONS, DETAILS, AND PAINT TO REPLACE SHUTTERS THAT ARE MISSING. ON FRONT PORTICO, REPAIR TWO ROUND COLUMNS AND TWO SQUARE PILASTERS THAT ARE DETERIORATED BY REMOVING INAPPROPRIATE REPAIRS AND DETERIORATED PAINT, AND REPAIR USING ABATRON LIQUID WOOD AND WOOD EPOX, SAND, PRIME AND PAINT WITH TWO COATS OF WHITE PAINT TO MATCH EXISTING. PAINT FRONT DOOR SHERWIN WILLIAMS SW-6258 “TRICORN BLACK”. ON ROOF, REPLACE MISSING ROOFING SLATES IN KIND TO MATCH EXISTING. AT REAR BASEMENT ENTRANCE, INSTALL TWO 6’ LONG BLACK WROUGHT IRON HANDRAILS. ON REAR, CONSTRUCT A NEW 10’ LONG, 14’ WIDE WOOD PORCH, WHICH WILL NOT BE VISIBLE FROM A PUBLIC RIGHT OF WAY. THE SLOPED ROOF WILL RANGE FROM 8’ TO 11’ TALL. THE PORCH WILL REPLACE A MISSING PORCH. AT REAR WALL, FILL IN THE FORMER JOIST POCKETS WITH MORTAR THAT IS COMPATIBLE WITH THE BRICK IN HARDNESS (LIKELY A TYPE N MORTAR BLEND). PORCH FASCIA BOARDS WILL BE LOW-GLOSS AZEK. SHINGLES WILL BE GAF ARCHITECTURAL SHINGLES IN A GRAY COLOR. THE PORCH POSTS WILL BE WOOD, AND WILL BE WRAPPED WITH NEXTSTONE’S COUNTRY LEDGESTONE HIMALAYAN BROWN FAUX STONE SIDING COLUMN WRAP. THE EXISTING PORCH FLOOR WILL BE REMOVED AND REPLACED WITH MOSAIC TILE CO’S BEIGE AND GRAY PORCELAIN OUTDOOR TILE. INSTALL GILPIN SUMMIT BLACK ALUMINUM RAILINGS ON THE PORCH. INSTALL WHITE ALUMINUM K-STYLE GUTTERS AND WHITE ALUMINUM DOWNSPOUTS. ALL WORK TO BE COMPLETED AS PER PLANS AND DOCUMENTS IN CHAP FILES. INSTALL KITCHEN CABINETS, INSTALL NEW CERAMIC TILES IN THE BATHROOMS. INSTALL ENGINEERED WOOD FLOORING, PAINT THE INTERIOR OF HOUSE, LAMINATE BASEMENT WALLS WITH DRYWALL, INSTALL LAMINATE FLOORING IN THE BASEMENT. ) Original Permit Description:(COM2021-69592) AS PER CHAP: ON FAÇADE, INSTALL FIVE WOODEN SHUTTERS THAT MATCH EXISTING IN DIMENSIONS, DETAILS, AND PAINT TO REPLACE SHUTTERS THAT ARE MISSING. ON FRONT PORTICO, REPAIR TWO ROUND COLUMNS AND TWO SQUARE PILASTERS THAT ARE DETERIORATED BY REMOVING INAPPROPRIATE REPAIRS AND DETERIORATED PAINT, AND REPAIR USING ABATRON LIQUID WOOD AND WOOD EPOX, SAND, PRIME AND PAINT WITH TWO COATS OF WHITE PAINT TO MATCH EXISTING. PAINT FRONT DOOR SHERWIN WILLIAMS SW-6258 “TRICORN BLACK”. ON ROOF, REPLACE MISSING ROOFING SLATES IN KIND TO MATCH EXISTING. AT REAR BASEMENT ENTRANCE, INSTALL TWO 6’ LONG BLACK WROUGHT IRON HANDRAILS. ON REAR, CONSTRUCT A NEW 10’ LONG, 14’ WIDE WOOD PORCH, WHICH WILL NOT BE VISIBLE FROM A PUBLIC RIGHT OF WAY. THE SLOPED ROOF WILL RANGE FROM 8’ TO 11’ TALL. THE PORCH WILL REPLACE A MISSING PORCH. AT REAR WALL, FILL IN THE FORMER JOIST POCKETS WITH MORTAR THAT IS COMPATIBLE WITH THE BRICK IN HARDNESS (LIKELY A TYPE N MORTAR BLEND). PORCH FASCIA BOARDS WILL BE LOW-GLOSS AZEK. SHINGLES WILL BE GAF ARCHITECTURAL SHINGLES IN A GRAY COLOR. THE PORCH POSTS WILL BE WOOD, AND WILL BE WRAPPED WITH NEXTSTONE’S COUNTRY LEDGESTONE HIMALAYAN BROWN FAUX STONE SIDING COLUMN WRAP. THE EXISTING PORCH FLOOR WILL BE REMOVED AND REPLACED WITH MOSAIC TILE CO’S BEIGE AND GRAY PORCELAIN OUTDOOR TILE. INSTALL GILPIN SUMMIT BLACK ALUMINUM RAILINGS ON THE PORCH. INSTALL WHITE ALUMINUM K-STYLE GUTTERS AND WHITE ALUMINUM DOWNSPOUTS. ALL WORK TO BE COMPLETED AS PER PLANS AND DOCUMENTS IN CHAP FILES. INSTALL KITCHEN CABINETS, INSTALL NEW CERAMIC TILES IN THE BATHROOMS. INSTALL ENGINEERED WOOD FLOORING, PAINT THE INTERIOR OF HOUSE, LAMINATE BASEMENT WALLS WITH DRYWALL, INSTALL LAMINATE FLOORING IN THE BASEMENT. Feb 15, 2022
COM2022INSTALL (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (13) # PLUMBING FIXTURES AS PER CODE.$7,200Feb 9, 2022
COM2021SCOPE OF WORK: ALTERATIONS TO INCLUDE: JES PROPOSES TO INSTALL 37 LINEAR FEET OF BASEMENT GUTTER ALONG PERIMETER OF A RESIDENTIAL HOME/BASEMENT. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, PER SUBMITTED PLANS/SPECIFICATIONS, *NO CURBING OR UNDERPINNING TO BE DONE$3,100Sep 22, 2021
COM2021INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (21) # BRANCH CIRCUITS/FEEDERS AS PER CODE.$3,500Sep 10, 2021
COM2021INSTALL (2) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 60000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.$4,500Sep 2, 2021
COM2021AS PER CHAP: ON FAÇADE, INSTALL FIVE WOODEN SHUTTERS THAT MATCH EXISTING IN DIMENSIONS, DETAILS, AND PAINT TO REPLACE SHUTTERS THAT ARE MISSING. ON FRONT PORTICO, REPAIR TWO ROUND COLUMNS AND TWO SQUARE PILASTERS THAT ARE DETERIORATED BY REMOVING INAPPROPRIATE REPAIRS AND DETERIORATED PAINT, AND REPAIR USING ABATRON LIQUID WOOD AND WOOD EPOX, SAND, PRIME AND PAINT WITH TWO COATS OF WHITE PAINT TO MATCH EXISTING. PAINT FRONT DOOR SHERWIN WILLIAMS SW-6258 “TRICORN BLACK”. ON ROOF, REPLACE MISSING ROOFING SLATES IN KIND TO MATCH EXISTING. AT REAR BASEMENT ENTRANCE, INSTALL TWO 6’ LONG BLACK WROUGHT IRON HANDRAILS. ON REAR, CONSTRUCT A NEW 10’ LONG, 14’ WIDE WOOD PORCH, WHICH WILL NOT BE VISIBLE FROM A PUBLIC RIGHT OF WAY. THE SLOPED ROOF WILL RANGE FROM 8’ TO 11’ TALL. THE PORCH WILL REPLACE A MISSING PORCH. AT REAR WALL, FILL IN THE FORMER JOIST POCKETS WITH MORTAR THAT IS COMPATIBLE WITH THE BRICK IN HARDNESS (LIKELY A TYPE N MORTAR BLEND). PORCH FASCIA BOARDS WILL BE LOW-GLOSS AZEK. SHINGLES WILL BE GAF ARCHITECTURAL SHINGLES IN A GRAY COLOR. THE PORCH POSTS WILL BE WOOD, AND WILL BE WRAPPED WITH NEXTSTONE’S COUNTRY LEDGESTONE HIMALAYAN BROWN FAUX STONE SIDING COLUMN WRAP. THE EXISTING PORCH FLOOR WILL BE REMOVED AND REPLACED WITH MOSAIC TILE CO’S BEIGE AND GRAY PORCELAIN OUTDOOR TILE. INSTALL GILPIN SUMMIT BLACK ALUMINUM RAILINGS ON THE PORCH. INSTALL WHITE ALUMINUM K-STYLE GUTTERS AND WHITE ALUMINUM DOWNSPOUTS. ALL WORK TO BE COMPLETED AS PER PLANS AND DOCUMENTS IN CHAP FILES. INSTALL KITCHEN CABINETS, INSTALL NEW CERAMIC TILES IN THE BATHROOMS. INSTALL ENGINEERED WOOD FLOORING, PAINT THE INTERIOR OF HOUSE, LAMINATE BASEMENT WALLS WITH DRYWALL, INSTALL LAMINATE FLOORING IN THE BASEMENT. $16,000Jul 26, 2021

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.