Baltimore City · 21229
201 N BEND RD
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $36,687,000
- Land use
- Exempt Commercial (EC)
- Year built
- 1962
- Last sale
- Jan 1, 1797
Assessment
| Owner | MAYOR AND CITY COUNCIL OF |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $36,687,000 (cycle 2026) |
| Last sale | Jan 1, 1797 |
| Year built | 1962 |
| Zoning | R-5 |
| Vacant | — |
Permits
4| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2022 | INSTALL FIRE ALARM DEVICES PER PLANS AS PER CODE. | $10,000 | May 1, 2023 |
| COM2022 | DEMOLISHING ALL EXISTING PARTIAL SPRINKLER SYSTEMS AND INSTALLING A NEW SPRINKLER SYSTEM (668 HEADS) THROUGHOUT 100% OF THE BUILDING. DESIGN SHALL BE PER LIGHT HAZARD AND ORDINARY HAZARD GROUP OCCUPANCY PER NFPA 13,2016. AS PER PLANS AS PER CODE. | $368,000 | Sep 16, 2022 |
| COM2022 | [181 NORTH BEND ROAD] PROJECT SCOPE: INTERIOR ALTERATIONS TO INCLUDE REPLACEMENT OF AIR CONDITIONING EQUIPMENT AT NORTH BEND PK-8 SCHOOL. THE EQUIPMENT TO BE REPLACED UNDER THIS PROJECT INCLUDES FOUR AIR HANDLING UNITS, CHILLED, CONDENSER AND HEATING WATER PUMPS AND SEVERAL FANS. A NEW ROOFTOP UNIT WILL ALSO BE PROVIDED TO SERVE THE GYMNASIUM AND SPLIT SYSTEM AC UNITS WILL BE PROVIDED TO SERVE THE IT ROOMS. ALL OF THE DUAL TEMPERATURE PIPING IN THE BUILDING WILL ALSO BE REPLACED. STRUCTURAL SUPPORTS FOR THE GYMNASIUM UNIT WILL BE PROVIDED AND THE CEILINGS IN THE CORRIDOR WILL BE REPLACED TO THE INSTALLATION OF THE NEW MECHANICAL PIPING. ELECTRICAL MODIFICATIONS TO SUPPORT THE MECHANICAL WORK WILL BE PROVIDED. ALSO ALL NEW LIGHTING AND LIGHTING CONTROLS IN THE CORRIDORS WILL BE PROVIDED, AS PER PLANS AS PER CODE. | $2,300,000 | Aug 10, 2022 |
| COM2022 | [181 NORTH BEND ROAD] PROJECT SCOPE: THIS PROJECT INCLUDES FIRE SAFTEY UPGRAES AT NORTH BEND PK-8 SCHOOL. THE PROJECT SCOPE INCLUDES REPLACEMENT OF THE EXISTING FIRE ALARM SYSTEM AND THE ADDITION OF A WET PIPE SPRINKLER SYSTEM (640 HEADS TOTAL). UNDER THIS PROJECT, THE BUILDING WILL BECOME FULLY SPRINKLERED. SIGNAGE IN THE BUILDING WILL ALSO BE REPLACED UNDER THIS PROJECT. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALRAM SYSTEMS. | $500,000 | Aug 10, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyApr 17, 2026 · 143 m
- violation: HCD-Illegal DumpingApr 1, 2026 · 143 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.