Baltimore County · 00000

35 ROSEWOOD LN

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$14,565,567
Land use
Exempt Commercial (EC)

Assessment

Additional detail for this property — owner, sale history, and structure information — isn't available yet.

Land useExempt Commercial (EC)
Total assessment$14,565,567 (cycle 2026)

Permits

10
TypeStatusDescriptionCostIssuedContractor
Comm. Permit - Retaining WallISSUEConstruct 2 segmental block retaining walls, 142LF, 11' in height and 82FT, 12' in height on side of property. Retaining walls over 4’ in height require a fence or railing, 42” minimum height above the wall, if the wall is closer than 2’ to a walk, path, parking lot or driveway on the high side. Must follow all retaining wall check list and construction phase service requirements. Retaining wall letter attached. ESC devices must be installed and inspected before any work starts$57,540Jun 17, 2026
Comm. Permit - Retaining WallISSUEConstruct 1 segmental block retaining wall, 496LF, 24.77' in height, on side of property. Retaining walls over 4’ in height require a fence or railing, 42” minimum height above the wall, if the wall is closer than 2’ to a walk, path, parking lot or driveway on the high side. Must follow all retaining wall check list and construction phase service requirements. Retaining wall letter attached. ESC devices must be installed and inspected before any work starts$689,150Jun 17, 2026
Comm. Permit - SprinklerISSUEInstall 8" Fire line in commercial building per plan. Largest pipe size 8". Meter size 8". Related permit C26-00472. Please contact the Office of the Fire Marshal at 410-887-4880 to schedule an inspection. 5. Fire hydrants.$200,000Jun 14, 2026
Comm. Permit - Storm WaterISSUEStorm Water Management for 2.03 acres drainage area. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL.$77,000Apr 1, 2026
Comm. Permit - GradingISSUEGrade 185,848sf for a future school and gym addition to the existing building, parking lots, driveways and underground SWM facility. Permit expires two years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal.$200,000Mar 29, 2026John Kruger
Comm. Permit - Temporary TentISSUEErect 4,200sf conditioned, temporary enclosed tent for religious prayer. To be erected on 6/23/25 - 12/23/25 on existing asphalt parking lot. Toilet facilities in existing building. Flame certificate attached. Tent must be removed within 24 hours of the expiration date of this permit. Failure to remove the tent(s) is a violation of the Baltimore County Code and can result in fines of up to $1,000 per day. Separate permit required for any electrical or plumbing work.Jun 22, 2025
Comm. Permit - Alteration *ISSUEINT ALTS TO INCLUDE:CONSTRUCT MASONRY WALLS FOR | ELEVATOR SHAFT & ELEVATOR PER PLANS 331SF. | SEPARATE PERMIT REQUIRED FOR ANY ADDITIONAL | WORK.May 12, 2021
Comm. Permit - New Structure/Shell *CLOSEDCONSTRUCT PARTIAL 3 STORY SCHOOL/SYNAGOGUE W/FOOD PREP AREA BLDG, 300'X288'X47'=93351SF : CONST 02 PLOT 9 R PLAT 0 DATA 0 ELEC YES PLUMB YESMar 22, 2002
Comm. Permit - New Structure/Shell *CLOSEDCONSTRUCT FOUNDATION FOR FUTURE SCHOOL. SEPARATE PERMITS REQUIRED TO COMPLETE BUILDING. ISSUED AT HOLDER'S RISK, THIS PERMIT DOES NOT COMMIT BALTIMORE COUNTY TO ISSUE ANY FURTHER PERMITS. 300'X288'=86,400SF : CONST 2 PLOT 9 R PLAT 0 DATA 0 ELEC YES PLUMB YESFeb 25, 2002
Comm. Permit - Retaining Wall *CLOSEDERECT 255LF OF 0-13.45'HIGH CONCBLOCK RETAINING WALL ON SIDE OF PROPERTY, WAIVE DATA SHEETS-CEN : CONST 02 PLOT 6 R PLAT 0 DATA 0 ELEC YES PLUMB YESFeb 8, 2002

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.