Baltimore County · 21030

0 YORK RD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$0
Land use
Industrial (I)

Assessment

Additional detail for this property — owner, sale history, and structure information — isn't available yet.

Land useIndustrial (I)
Total assessment$0 (cycle 2026)

Permits

16
TypeStatusDescriptionCostIssuedContractor
Comm. Permit - New Structure/ShellISSUEConstruct Utility Yard electrical enclosure 42'x26.7' = 1,117SF. Erosion and Sediment Control Inspection must be scheduled and passed prior to any building activity.$6,000,000Mar 31, 2025
Comm. Permit - New Structure/ShellEXPIREDAlterations to complete. Partial framing inspection: 2/26/2024. Construct storage building (BLDG #1) in existing fleet service yard per plans 100'x42'x17.3'=4200sf$1,413,000Jul 1, 2024
Comm. Permit - SolarISSUEInstall 147-66.225kw solar panels on roof of ex Commercial bldg (service center office). Certificate of solar panel installation to be submitted to inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County.$3,566,770May 29, 2024
Comm. Permit - SolarISSUEExterior alts to install 95-46200kw solar panels flush mounted on roof of existing commercial building. Certificate of Installation to be given to inspector at final Inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County.$1,060,000May 29, 2024
Comm. Permit - SolarISSUEExterior alts to install 100-45kw solar panels flush mounted on roof of existing commercial building. Certificate of Installation to be given to inspector at final Inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County.$1,060,000May 28, 2024
Comm. Permit - SolarISSUEInstall 47-21.175kw solar panels on roof of ex Commercial bldg (fleet shop). Certificate of solar panel installation to be submitted to inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County.$1,000,405Dec 20, 2023
Comm. Permit - SignISSUEInstall (1) non-illuminated wall/notice sign and (1) non-illuminated perimeter fence/notice sign 1.75x2=3.5sf 2x3=6sf$2,000Oct 20, 2023
Comm. Permit - SignISSUEInstall (2) non-illuminated freestanding post & panel signs 2.5x3=7.5sf (DS) 5x5.38=26.9 (SS)$4,000Oct 20, 2023
Comm. Permit - AlterationISSUEConstruct structural reinforcement to roof frame to support rooftop mounted solar panels. 3,200sf Separate permit required for any additional work.$1,000,405Oct 15, 2023
Comm. Permit - AntennasISSUEInstall 2 antennas on existing exterior building wall at existing BG & E substation and upgrade ancillary equipment as per plans. This is for BG & E internal communications only. No Change in height.$9,000Jun 20, 2023
Comm. Permit - New Structure/ShellISSUEConstruct bulk material storage building in existing utility fleet yard per plans 62'x24'x18.75=1488SF.$416,000May 16, 2023Buch Construction Inc
Comm. Permit - New Structure/ShellISSUEConstruct storage building (BLDG #2) in existing utility fleet yard per plans 105'x42'x17.5'=4410 sf$916,000May 16, 2023Buch Construction Inc
Comm. Permit - New Structure/ShellOPENConstruct storage building (BLDG #1) in existing fleet service yard per plans 100'x42'x17.3'=4200sf$1,413,000May 16, 2023Buch Construction Inc
Comm. Permit - GradingISSUEGrading associated with construction of new two storage building and EV chargers. LOD 84,163sf. This permit expires two years from issue date. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL.$100,000Apr 18, 2023
Comm. Permit - TanksISSUERemove (1) 550 gallon underground oil storage tank and install (1) 550 gallon underground oil storage tank in same location on rear of property of business. Must comply with NFPA 30 and COMAR 26.10.01. Manufacturer's instructions required on site during installation. Tank removal letter attached.$44,998Dec 6, 2022Justin Fortney
Comm. Permit - FenceISSUEERECT 1460 LF OF 7' HIGH CHAINLINK FENCE ON SIDE AND REAR OF COMMERCIAL BUILDING.Sep 12, 2022

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.