Baltimore County · 21219
1150 ORE PIER RD
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $16,096,700
- Land use
- Industrial (I)
Assessment
Additional detail for this property — owner, sale history, and structure information — isn't available yet.
| Land use | Industrial (I) |
|---|---|
| Total assessment | $16,096,700 (cycle 2026) |
Permits
showing 50 of 63| Type | Status | Description | Cost | Issued | Contractor |
|---|---|---|---|---|---|
| Comm. Permit - Antennas | ISSUE | AT&T is proposing to modify an existing monopole. Install 3 antennas on existing monopole. 190'. | $15,000 | Jun 10, 2026 | — |
| Comm. Permit - Sprinkler | ISSUE | CBCA. Install new NFPA 13 system with 1344 sprinkler heads in commercial space per plans. Largest pipe size – 8”, light hazard occupancy. See related permit # C25-02081 for New Commercial Building. Please contact the Office of the Fire Marshal at 410-887-4880 to schedule an inspection. | $403,000 | Apr 22, 2026 | — |
| Comm. Permit - Antennas | ISSUE | CBCA. Install (3) new antennas, and install (1) new hybrid. Height of proposed work is 180'. | $75,000 | Mar 12, 2026 | — |
| Comm. Permit - Grading | ISSUE | CBCA - grading for future holding of dredged material. LOD 2,588,577sf. Permit expires two years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. Proposed work not in the floodplain. | $129,429 | Feb 13, 2026 | — |
| Comm. Permit - New Structure/Shell | ISSUE | CBCA. Construct 1-story industrial building with crane access 930'x227'x54'=137,599sf per plans. Separate permit required for any additional work. Erosion and Sediment Control Inspection must be scheduled and passed prior to any building activity. Crane by others. DRC# 080525E. Work is not in the floodplain. | $3,000,000 | Feb 13, 2026 | — |
| Comm. Permit - Foundation Only | ISSUE | CBCA. Construct concrete slab foundation only for pre-manufactured building 47'x72.7'=3417sf. Separate permits required to complete building. Issued at holder’s risk, this permit does not commit Baltimore County to issue any further permits. The proposed work is not in the floodplain. | $750,000 | Feb 9, 2026 | — |
| Comm. Permit - New Structure/Shell | ISSUE | Construct dome 134'x134'x130' and Silo 53'x53'x150' for concrete facility. Overall 30,186sf. Erosion and Sediment Control Inspection must be scheduled and passed prior to any building activity. Refer to C25-01628 for foundation only and CEN25-000166 for grading. Separate permit required for any additional work. The work is not in the floodplain. | $10,000,000 | Feb 9, 2026 | — |
| Comm. Permit - New Structure/Shell | ISSUE | CONSTRUCT 1STY EQUIPMENT/ELECTRICAL BUILDING 63'X33'X18'=2066SF. EROSION AND SEDIMENT CONTROL INSPECTION MUST BE SCHEDULED AND PASSED PRIOR TO ANY BUILDING ACIVITY. THE PROPOSED WORK IS NOT IN THE FLOODPLAIN. | $1,000,000 | Feb 5, 2026 | — |
| Comm. Permit - New Structure/Shell | ISSUE | CONSTRUCT 1STY OFFICE/MAINTENANCE SHOP BUILDING 73'X47'X18'=3421SF. EROSION AND SEDIMENT CONTROL INSPECTION MUST BE SCHEDULED AND PASSED PRIOR TO ANY BUILDING ACIVITY. THE PROPOSED WORK IS NOT IN THE 100-YEAR FLOODPLAIN. | $1,500,000 | Feb 5, 2026 | — |
| Comm. Permit - Grading | ISSUE | Grading and paving for future industrial building. LOD 613,039sf. Permit expires two years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. | $30,652 | Feb 3, 2026 | — |
| Comm. Permit - Sprinkler | OPEN | CBCA. Install 8” main fire line to Industrial Warehouse: to include stub-in. Related permit C25-02081. Meter size 8". Please contact the Office of the Fire Marshal at 410-887-4880 to schedule an inspection. | $500,000 | Jan 30, 2026 | — |
| Comm. Permit - Grading | ISSUE | CBCA. GRADE 160,300SF FOR FUTURE FACTORY. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. WORK NOT IN FP PER MV. | $8,015 | Dec 4, 2025 | — |
| Comm. Permit - Foundation Only | ISSUE | CBCA. CONSTRUCT CONCRETE SLAB FOUNDATION FOR FUTURE BUILDING AND DOMES. 38,242SF. SEPARATE PERMITS REQUIRED TO COMPLETE BUILDING AND DOMES. ISSUED AT HOLDER'S RISK, THIS PERMIT DOES NOT COMMIT BALTIMORE COUNTY TO ISSUE ANY FURTHER PERMITS. THE PROPOSED WORK IS NOT IN THE 100-YEAR FLOODPLAIN. | $8,700,000 | Dec 4, 2025 | — |
| Comm. Permit - Grading | ISSUE | Industrial grading. LOD 803,250sf. This permit replaces expired permit B981887. All previously approved plans are valid for this permit. This permit expires 7/11/2027. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal | $40,163 | Nov 4, 2025 | — |
| Comm. Permit - Razing | ISSUE | Raze 3 pumping station buildings. Building #1: 3,142sf, building #2: 2,009sf, building #3: 2,998sf. To be torn down all foundations to remain. Debris to be hauled to approved sanitary landfill in accordance with applicable Baltimore County site regulations. Sewer to be capped. Permit expires 90 days from date of issue. Pumping station build 1950 | $75,000 | Sep 30, 2025 | — |
| Comm. Permit - Grading | ISSUE | CBCA - grade 166,959sf for installation of BGE transmission lines. New installation of underground conduit and associated manholes. Permit expires two years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. The proposed work is allowed in the floodplain. | $100,000 | Aug 27, 2025 | — |
| Comm. Permit - Foundation Only | ISSUE | CBCA. Construct foundation for future industrial building. Separate permits required to complete building. Issued at holder’s risk, this permit does not commit Baltimore County to issue any further permits. The proposed work is not in the floodplain. | $8,070,900 | Aug 20, 2025 | — |
| Comm. Permit - Grading | OPEN | Grade 152,460sf for industrial use. Permit expires two years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. The proposed work is not in the floodplain. | $7,623 | Aug 11, 2025 | — |
| Comm. Permit - Storm Water | ISSUE | CBCA - proposed one (1) SWM Facility for storage of various bulk materials in response to the collapse of the Key Bridge. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. Work is not in the floodplain. | $1,755,624 | Jun 9, 2025 | — |
| Comm. Permit - Grading | ISSUE | CBCA - grading and paving of approximately 2,982,989 SF or 68.48 AC for emergency storage for the Key Bridge. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. | $149,149 | Jun 9, 2025 | — |
| Comm. Permit - Temporary Structures | ISSUE | CBCA-The proposed plan is for two 40' connex boxes with a 35' dome canopy. The purpose it to create a temporary working bay on the property. Permit expires 6 months from date of issue and is non-renewable. 2040SF. The work is not in the floodplain. | — | Jun 4, 2025 | — |
| Comm. Permit - Temporary Structures | ISSUE | CBCA-Construct temporary office trailer for rental operations. Permit expires 6 months from date of issue and is non-renewable. 56’2"x19’10"=1114SF. Work is not in the floodplain. | — | Jun 1, 2025 | — |
| Comm. Permit - Temporary Structures | ISSUE | Construct temporary wash bay. Permit expires 6 months from date of issue and is non-renewable. 18’2"x50’=908SF. The work is not in the floodplain. | — | May 2, 2025 | — |
| Comm. Permit - New Structure/Shell | ISSUE | CBCA. Construct 1-story shell tiltwall warehouse with office and mezzanine 1064'x370'x40'=414,960sf. This permit cancels and replaces C23-02299, change in construction and expires 2/6/25. | $1,500,000 | Mar 27, 2025 | — |
| Comm. Permit - Alteration | ISSUE | CBCA. OFFICE INTERIOR ALTERATIONS TO INCLUDE: CONSTRUCT PARTITIONS, CEILING GRID/TILE, HVAC/DUCTWORK, MILLWORK, DOORS, ADA RESTROOMS, EQUIPMENT, FIXTURES, & FINISHES. 18,259SF. ADDITIONAL WORK REQUIRES SEPARATE PERMIT. | $500,000 | Mar 27, 2025 | — |
| Comm. Permit - New Structure/Shell | ISSUE | CBCA-Proposed construction on an approx. 43,400 SF conveyor system to assist with unloading ships. See CEN24-000177 grading & CEN24-000178 storm water. | $14,000,000 | Mar 17, 2025 | — |
| Comm. Permit - Temporary Structures | ISSUE | Construct a temporary guard booth w/ office and bathroom. 8' x 12' x 8' = 96 SF. Bathroom will not be utilized until guard house is placed in the permanent location. Permit expires 6 months from date of issue and is non-renewable. 8’x12’x8’=96sf. | — | Nov 18, 2024 | — |
| Comm. Permit - Antennas | ISSUE | CBCA - AT&T is proposing to modify an existing cell site to upgrade its equipment. Remove (6) antennas and install (3) new antennas. Height of proposed work 190'. Work is in 100 Year Floodplain. | $20,000 | Oct 29, 2024 | — |
| Comm. Permit - Sprinkler | OPEN | NFPA 13 System. Add 2,106 sprinkler heads. Largest Pipe Size 8". Meter Existing | $872,000 | Jul 12, 2024 | — |
| Comm. Permit - Structure - Env Health | ISSUE | Construct 1-story 816' x 250' x 44' = 204,000 SF warehouse building per plans. | $900,000 | Feb 20, 2024 | — |
| Comm. Permit - Alteration | ISSUE | CBCA. Interior alteration for new tenant to include: construct new metal stud drywall partitions, ADA restrooms, ceiling tile and grid, fixtures and finishes as per plans - 827 sf | $66,160 | Feb 14, 2024 | — |
| Comm. Permit - New Structure/Shell | CANCELLED | CBCA-Construction of a approximately 1064'X370'X40'= 414,960 SF 1-story shell tiltwall warehouse building with an office and mezzanine per plans. See CEN23-000162 grading | $750,000 | Feb 7, 2024 | — |
| Comm. Permit - Sprinkler | ISSUE | CBCA. Install 12" underground fire line service for fire hydrant. Meter size 12", related permit C23-02299 | $100,000 | Jan 30, 2024 | — |
| Comm. Permit - New Structure/Shell | ISSUE | Revision to permit C22-02041 to include: Changed Door Locations, Slab Modifications, They want to install the underground plumbing now, New Electrical Conduits for Future Generator, Changed Dock Pit Locations, One New Exterior Door. CHANGE TO APPROVED PLANS ONLY. SEE ATTACHED LETTER FROM ARCHITECT. NO CHANGE IN SF, LOCATION OR SETBACKS OR SCOPE OF WORK. SEPARATE PERMIT REQD FOR ANY ADDL WORK. | $50,000 | Jan 5, 2024 | TO BE DETERMINED |
| Comm. Permit - Grading | ISSUE | Grade 1,047,052sf for future warehouse. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. | $52,353 | Dec 13, 2023 | — |
| Comm. Permit - Grading | ISSUE | Grade 3,250,267sf for industrial building. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. | $162,513 | Oct 6, 2023 | — |
| Comm. Permit - Razing | ISSUE | Raze operations building. To be torn down. Debris to be hauled to approved sanitary landfill in accordance with applicable Baltimore County site regulations. Sewer to be capped. Permit expires 90 days from date of issue. 14,569sf | $20,000 | Sep 6, 2023 | — |
| Comm. Permit - Alteration | ISSUE | CBCA- Interior alterations to include: Construct temporary support for existing steel girder and replace seven (7) collision-damaged steel posts per marked plans. 70sf Separate permit required for any additional work. | $50,000 | Sep 6, 2023 | — |
| Comm. Permit - Alteration | ISSUE | CBCA-Alterations to include: Cut four holes into existing wall for pipe penetration 100sf. Separate permit for any additional work. | $50,000 | Aug 25, 2023 | — |
| Comm. Permit - Sprinkler | ISSUE | Install new NFPA 13 System. Add 2081 sprinkler heads. Largest pipe size 8". Fire pumps added: 1. Related permit: C23-00712. | $530,000 | Jul 19, 2023 | — |
| Comm. Permit - Sprinkler | ISSUE | 10" waterline in private access drive for fire hydrant service. Fire line size is 10". | $100,000 | Jul 14, 2023 | — |
| Comm. Permit - Grading | ISSUE | CBCA. Grade 575,476 SF for proposed industrial building. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. | $28,773.8 | Jun 15, 2023 | — |
| Comm. Permit - Antennas | ISSUE | Install 12 antennas, 9 radios and associated cabling accessories on existing monopole tower with associated equipment cabinet on the ground within existing compound. | $42,000 | Apr 29, 2023 | — |
| Comm. Permit - Sprinkler | ISSUE | Install NFPA 13 system. Install 128 Sprinkler Heads. Largest pipe size: 6". Related Permit #: B982417 | $37,972 | Mar 14, 2023 | — |
| Comm. Permit - Sprinkler | ISSUE | INSTALL 1296 SPRINKLER HEADS. LARGEST PIPE SIZE 8". RELATED PERMITS C22-03556. | $250,000 | Dec 28, 2022 | — |
| Comm. Permit - Sprinkler | OPEN | INSTALL 178 SPRINKLER HEADS. LARGEST SIZE 6". RELATED PERMITS C22-03352 | $55,000 | Dec 20, 2022 | — |
| Comm. Permit - Sprinkler | OPEN | Installation of fireline for proposed building. Pipe size 8". Install 1 fire hydrant. | $75,000 | Nov 22, 2022 | TBD |
| Comm. Permit - Grading | OPEN | Grading for proposed sewer line relocation 83363sf. This permit expires two years from issue date. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. | $75,000 | Nov 21, 2022 | — |
| Comm. Permit - Grading | OPEN | Grade 154,638 SF for proposed building and maintenance yard. Permit expires 2 years from date of issue. No construction to begin until pre-construction meeting. Failure to comply will result in penalties. Schedule your pre-construction meeting in your portal. | $195,000 | Nov 1, 2022 | — |
| Comm. Permit - Sprinkler | ISSUE | INSTALLATION OF 8" FIRELINE. METER SIZE 10". RELATED PERMIT B980533. | — | Oct 21, 2022 | — |
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.