Baltimore County · 21220

4038 CHESTNUT RD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$853,900
Land use
Residential (R)

Assessment

Additional detail for this property — owner, sale history, and structure information — isn't available yet.

Land useResidential (R)
Total assessment$853,900 (cycle 2026)

Permits

6
TypeStatusDescriptionCostIssuedContractor
Res. Permit - New DwellingISSUECBCA. CONSTRUCT 3STY ABOVE-GRADE SFD TO BE STREETSIDE COV'D PORCH, WATERSIDE COV'D & SCREENED PORCH, GAS FP (O/S PROJ NOT TO EXCEED 4'X10'), FAMILY ROOM, FUTURE ELEVATOR, STUDY, 4 BEDROOMS, 3 BATHROOMS, 1 POWDER ROOM. 30'X64'X37'=3885SF. SPRINKLERS REQ'D. NOT PATTERN BOOK. REFERENCE VARIANCE CASE #2023-0113-SPHA. SEPARATE "RAZING" PERMIT REQUIRED TO RAZE EXISTING DWELLING. SEPARATE "ACCESSORY STRUCTURE" PERMIT REQUIRED TO CONSTRUCT DETACHED GARAGE. NOT IN 100 YEAR FLOODPLAIN. EROSION AND SEDIME$400,000May 30, 2025
Res. Permit - TanksISSUECBCA. Install (2) 120-gallon propane tank above ground on side property of existing waterfront SFD. Must comply with NFPA 58. Manufacturer's instructions will be on site. Separate Gas permit required to run line from tank to stub. Work not in a 100 year floodplain.$4,000Feb 14, 2025
Res. Permit - SprinklerISSUECBCA. Install NFPA 13D system with 36 sprinkler heads. Largest pipe size 1". Meter size 3/4". Related permit R23-06397$3,000Jul 22, 2024
Res. Permit - RazingISSUERaze sfd. To be torn down. Debris to be hauled to approved sanitary landfill in accordance with applicable Baltimore County site regulations. Sfd constructed in 1929. Irregular shape 27'x39'=870sf. Sewer to be capped. Rat eradication letter attached. This permit expires 90 days from date of issuance.$10,000Mar 10, 2024
Res. Permit - GradingISSUEInstall 50' stone revement placed on filter fabric maximum 10' channel ward of existing toe 48" tall. Army Corps and State Permits may be required for this construction. CBCA. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL.$10,000May 11, 2023MILTON A REHBEIN III
Res. Permit - Piers and PilingsISSUECBCA Construct 100' long by 6' wide pier with 2 pwc lifts 1 boat lift with associated piles with 2 mooring piles all extending 100' channel ward on Seneca Creek. Army Corps & State Permits may be required for the proposed construction. Construct per county plans and guidelines$20,000Apr 25, 2023MILTON A REHBEIN III

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.