Baltimore County · 21222

1100 N POINT RD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$3,321,700
Land use
Industrial (I)

Assessment

Additional detail for this property — owner, sale history, and structure information — isn't available yet.

Land useIndustrial (I)
Total assessment$3,321,700 (cycle 2026)

Permits

7
TypeStatusDescriptionCostIssuedContractor
Comm. Permit - AlterationISSUEThis permit cancels and replaces issued C23-00782. This permit is to comply with field changes per the stop work order. This permit replaces sheets A-001, A-101, A-102, A-103, A-201, A-301, A-302, A-303, A-304, A-401, S2, S2A, S3, S4, S4.1, S4.2, S6, M-100, M-101, M-103, M-104, newly submitted drawings for Pre-engineered metal building S0-S9 and SD-1 thru SD-5, refer to architects letter for changes. All sheets on the approved plan set are still approved for this construction. This permit e$75,000Dec 8, 2025
Comm. Permit - SolarISSUEInstall 64.78kw solar panels on roof of existing bldg. Certificate of solar panel installation to be submitted to inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County. A consultation with Electrical Inspection is required before any work begins at this site. Please contact the Electrical Inspections office at 410-887-3960 to sc$32,390Aug 10, 2025
Comm. Permit - SignISSUE1 LED WALL SIGN (1' x 10.58')$1,000Feb 21, 2025
Comm. Permit - Storm Water *ISSUESTORM WATER MANAGEMENT FOR 0.28AC DRAINAGE. PERMIT EXPIRES TWO YEARS FROM DATE OF ISSUE. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE PRE-CONSTRUCTION MEETING THROUGH YOUR PORTAL.Jun 7, 2023
Comm. Permit - Grading *OPENGRADE 35,000SF DISTURBED AREA FOR FUTURE BUILDING. PERMIT EXPIRES TWO YEARS FROM DATE OF ISSUE. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE PRE-CONSTRUCTION MEETING THROUGH YOUR PORTAL.Jun 7, 2023Matt Ritter
Comm. Permit - Razing *ISSUERAZE ONE STORY CAR WASH - FOUNDATION TO REMAIN 7975SF. TO BE TORN DOWN, DEBRIS TO BE HAULED TO AN APPROVED SANITARY LANDFILL IN ACCOURDANCE WITH APPLICABLE BALTIMORE COUNTY SITE RETS. PEST LETTER ATTACHED. SEWER CAP TO BE FINALED. PERMIT EXPIRES 90 DAYS FROM DATE OF ISSUE.Mar 29, 2022
Comm. Permit - AlterationCLOSEDINTERIOR ALTERATIONS INCLUDES:DEMO & CONSTRUCT | DRYWALL METAL STUD PARTITIONS,CEILG TILE/GRID, | HVAC MODIFICATIONS, FIXTURES AND FINISHES. | 1085SF SEPARATE PERMIT REQ'D FOR ANY | ADD'L WORK. S.P.O.S. PER ALB-WAIVE PLANS.Feb 20, 2015

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.