Baltimore County · 21219

1365 SPARROWS POINT BLVD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$112,203,600
Land use
Commercial Condominium (CC)

Assessment

Additional detail for this property — owner, sale history, and structure information — isn't available yet.

Land useCommercial Condominium (CC)
Total assessment$112,203,600 (cycle 2026)

Permits

16
TypeStatusDescriptionCostIssued
Comm. Permit - AlterationISSUECBCA. Interior alterations to replace storage racks inside the warehouse. Finishes and fixtures per plans 32262 SF. Separate permit required for any additional work.$543,303Mar 18, 2026
Comm. Permit - AlterationISSUEInterior alterations to include: Construct metal stud and drywall partitions, ceiling tile and grid, ADA restrooms, 3 breakrooms, elevator, HVAC ductwork, finishes and fixtures per plans 21,703sf. Separate permit required for any additional work. Refer to C23-02001 for Shell Building under construction.$400,000May 2, 2025
Comm. Permit - New Structure/ShellISSUECBCA-Construction of proposed 2-sty 1972' x 670'X46' = 1,327,973 SF industrial warehouse per plans. See CEN23-000127, C23-01715.$500,000May 2, 2025
Comm. Permit - AlterationISSUEInterior alteration to install storage racks inside the warehouse. Finishes and fixtures per plans 66800 SF. Separate permit required for any additional work.$1,293,089Jan 24, 2025
Comm. Permit - SolarISSUECBCA. MODIFY EXISTING PERMIT C24-01148 to update racking system for solar modules. Install 23826 - 13104kw solar panels to be on existing roof. Certificate of Installation to be submitted to Inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County. A consultation with electrical inspection is required before any work begins at this$500,000Dec 6, 2024
Comm. Permit - New Structure/ShellOPENCBCA. Construction of a guard booth with office and bathroom, 20' x 8' = 160 SF. Separate permit required for trades and any additional work.$50,000Sep 14, 2024
Comm. Permit - New Structure/ShellOPENCBCA. Construction of guard booth with office. 8' x8' = 64 SF. Separate permit required for any additional work.$35,000Sep 14, 2024
Comm. Permit - New Structure/ShellOPENCBCA. Construction of a guard booth with office and bathroom. 20' x 8' = 160 SF. Separate permit required for any additional work.$50,000Sep 14, 2024
Comm. Permit - SignISSUEInstall 12 signage for Floor & Decor.$23,000Aug 28, 2024
Comm. Permit - SolarISSUECBCA. Install 23,830 - 13,106.5kw solar panels on roof of existing bldg. Certificate of solar panel installation to be submitted to inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. Please contact Ty Basham, Chief Electrical Inspector, for a pre-con meeting at 410-887-3960.$5,000,000Jul 24, 2024
Comm. Permit - TanksISSUEInstall a 10,000-gallon hydrogen tank above ground on side of building to supply warehouse gaseous hydrogen for fuel cell powered forklifts. Manufacturer’s instructions attached. Will comply with NFPA 30.$750,000Jul 16, 2024
Comm. Permit - SprinklerISSUENFPA 13 system. Add 117 sprinkler heads. Largest pipe size 2", related permit C24-00481.$58,640Jun 29, 2024
Comm. Permit - Foundation OnlyISSUEConstruct 59'x45'=2655sf concrete pad and Duct Bank on property. Foundation only. Separate permit required for any additional work. See C23-01715 sprinkler$750,000Jun 19, 2024
Comm. Permit - SprinklerISSUEInstall NFPA 13 system with 14195 sprinkler heads. Largest pipe size 6", meter size 12", related permit C23-02001$3,127,470Jun 3, 2024
Comm. Permit - Foundation OnlyISSUECBCA. Construct 5' x 26' = 130 SF concrete foundation for truck-scale on side of commercial warehouse. Issued at holder’s risk, this permit does not commit Baltimore County to issue any further permits.$35,000Nov 9, 2023
Comm. Permit - SprinklerISSUE12" waterline in private access drive for fire hydrant service. Fire line size is 12"$100,000Sep 23, 2023

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.