Baltimore County · 21219
1900 WHARF RD
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $9,242,900
- Land use
- Exempt Commercial (EC)
Assessment
Additional detail for this property — owner, sale history, and structure information — isn't available yet.
| Land use | Exempt Commercial (EC) |
|---|---|
| Total assessment | $9,242,900 (cycle 2026) |
Permits
6| Type | Status | Description | Cost | Issued | Contractor |
|---|---|---|---|---|---|
| Comm. Permit - New Structure/Shell | ISSUE | CBCA. CONSTRUCT NEW STRUCTURE 104'X166'X28'=16,367SF TO BE GYMNASIUM, ACTIVITY ROOM, OFFICE SPACE, CONCESSION ROOM, AND ASSOCIATED SUPPORT SPACES. SPRINKLERS REQ'D. BALTIMORE COUNTY PROJECT. EROSION AND SEDIMENT CONTROL INSPECTION MUST BE SCHEDULED AND PASSED PRIOR TO ANY BUILDING ACTIVITY. | $6,000,000 | Feb 28, 2025 | — |
| Comm. Permit - Solar | ISSUE | Install 201-72.36kw solar panels on roof of existing building. Certificate of solar panel installation to be submitted to inspector at time of final inspection. Certificate of Installation to be submitted to Inspector at time of final inspection. UL3741 system shall not be used for rapid shutdown of rooftop solar arrays. A separate electrical permit is required by a Master Electrician licensed/registered with Baltimore County. A consultation with Electrical Inspection is required before any w | $200,000 | Nov 26, 2024 | — |
| Comm. Permit - Sprinkler | ISSUE | Install NFPA 13 system with 106 sprinkler heads. Largest pipe size 4", related permit C22-04646. Please contact the Office of the Fire Marshal at 410-887-4880 to schedule an inspection | $85,600 | Oct 12, 2024 | — |
| Comm. Permit - Sprinkler | ISSUE | CBCA. Install 8" fire line with 1 fire hydrant. Related permit C22-04646. | $100,000 | Jul 22, 2024 | — |
| Comm. Permit - Grading | ISSUE | CBCA- Grade 462,792SF for the new Sparrows Point Park recreation center building and associated hard surface play area, parking lots, and artificial turf fields for the creation of a new Sparrows Point Park. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE-CONSTRUCTION MEETING IN YOUR PORTAL. SEE C22-04646 NEW STRUCTURE | $2,200,000 | Aug 1, 2023 | Cody Sampson |
| Comm. Permit - Storm Water | ISSUE | CBCA Storm Water Management for 10.15 acres drainage area for two (2) submerged gravel wetland, one (1) perimeter sand filter, and non-rooftop disconnect facilities to treat impervious areas associated with the new Sparrows Point Park recreation building and associated hard surface play area, parking lots, and artificial turf field. Permit expires two years from date of issue. NO CONSTRUCTION TO BEGIN UNTIL PRE-CONSTRUCTION MEETING. FAILURE TO COMPLY WILL RESULT IN PENALTIES. SCHEDULE YOUR PRE- | $190,000 | Jul 3, 2023 | — |
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.