Baltimore City · 21202

301 SAINT PAUL PL

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$70,612,300
Land use
Commercial (C)
Year built
Last sale
Mar 11, 1987

Assessment

OwnerMERCY HOSPITAL INC
Land useCommercial (C)
Total assessment$70,612,300 (cycle 2026)
Last saleMar 11, 1987
Year built
ZoningC-5DC
Vacant

Permits

showing 50 of 103
TypeDescriptionCostIssued
BCCMThe work includes BFPE installing a new zone control assembly to provide sprinkle coverage in the existing chapel and mechanical room.$71,675Apr 17, 2026
BCCMTENANT FIT OUT OF FIRE ALARM This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$35,000Feb 12, 2026
BCCMAdd/Relocate sprinkler heads in existing building to protect the proposed layout for the 4th floor. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$7,575Jan 29, 2026
BCCMProvide and install (250) low voltage cables for telephones and computers as per code. Install (20) overhead speakers for hospital wide alerts/announcements. These speakers will run to the network closet on the floor as per code. Install (15) pull stations in Patient restrooms on the floor. An annunciator panel at the front desk as per code. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$80,666Jan 6, 2026
BCCM********* THIS PROJECT INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCATED SPACES FOR NEW REGISTRATION, WAITING, EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK:******* SCOPE OF WORK: --------- LEVEL II INTERIOR ALTERATIONS ----- INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES --------- TRADES ------- MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AND AS PER CODE.$2,600,000Sep 15, 2025
BCCMINSTALL NEW SPRINKLER SYSTEM TO PROTECT EXISTING MECHANICAL ROOM CORRIDORS.$5,900Aug 4, 2025
COM2023INSTALL A DRY-PIPE SRINKLER SYSTEM (31 HEADS) TO PROTECT THE EXISTING EMERGENCY DEPARTMENT OVERHAND ON THE 1ST LEVEL. A NEW DRY-PIPE WILL BE INSTLALED IN MECHANICAL ROOM P2000 PM THE 2ND LEVEL AS PER PLANS AS PER CODE.$100,800Jan 21, 2025
COM2023INSTALL NEW DRY SPRINKLER SYSTEM (38 HEADS) IN GENERATOR AND MECHANICAL ROOMS AS PER PLANS AS PER CODE.$65,000Jan 9, 2025
COM2024INSTALL FIRE ALARM AS PER PLANS AS PER CODE.$3,660Dec 23, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2024-01942:INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01942) INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.Nov 14, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2024-01942:INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01942) INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.Oct 9, 2024
COM2024INSTALL 39 FIRE ALARM DEVICES IN THE BURK BUILDING AS PER PLANS AS PER CODE. $15,000Oct 8, 2024
COM2024AMEND PERMIT: ADD HVAC AND PLUMBER CONTRACTORS . (ORIGINAL PERMIT:COM2024-01942:INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01942) INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.Sep 12, 2024
COM2024INCLUDES ALTERATION OF THE FOURTH LEVEL OF THE EXISTING POB/MCUALEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE. AS PER PLANS AS PER CODE.$400,000Aug 26, 2024
COM2024INSTALL FIRE ALARM AS PER PLANS AS PER CODE. $2,265Aug 7, 2024
USE2024USE PORTION FOR THE RETAIL SALES OF PRE-PACKAGED ICE CREAM.Jul 5, 2024
COM2024INSTALL (6) # LOW VOLTAGE AS PER CODE.$14,263Jun 17, 2024
COM2024RELOCATING 18 HEADS AS PER PLANS AS PER CODE.$8,550Jun 14, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2023-01254:SCOPE OF WORK:---------EXTERIOR ALTERATIONS-------ALTERATIONS INCIDENTAL TO REPLACEMANT OF AIR HANDLING UNIT ON THE ROOF OF THE BURK BUILDING. MODIFICATIONS INCLUDE, NEW FLOOR PENETRATIONS AND METAL ENCLOSURE FOR MECHANICAL DUCTWORK RISERS. RECONFIGURATION OF WORKSTATIONS AND SUPPORT EQUIPMENT. PATCH EXISTING ROOF FOR INSTALLATION OF DUCTWORK ROOF TOP AIR-HANDLING UNIT, PLENUM, AND SUPPORTS. AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2023-01254) SCOPE OF WORK:---------EXTERIOR ALTERATIONS-------ALTERATIONS INCIDENTAL TO REPLACEMANT OF AIR HANDLING UNIT ON THE ROOF OF THE BURK BUILDING. MODIFICATIONS INCLUDE, NEW FLOOR PENETRATIONS AND METAL ENCLOSURE FOR MECHANICAL DUCTWORK RISERS. RECONFIGURATION OF WORKSTATIONS AND SUPPORT EQUIPMENT. PATCH EXISTING ROOF FOR INSTALLATION OF DUCTWORK ROOF TOP AIR-HANDLING UNIT, PLENUM, AND SUPPORTS. AS PER PLANS AS PER CODE. May 24, 2024
COM2024SCOPE OF WORK: ----- LEVL II INTERIOR ALTERATIONS ------ INCLUDES ALTERATION OF THE SEVENTH LEVEL OF THE EXISTING POB/MCAULEY BUILDING. RENOVATE EXISTING MEDICAL OFFICE SUITE AND ADJACENT ASSOCIATED SPACES FOR NEW EXAM ROOMS AND OFFICES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND LOW VOLTAGE AS PER PLANS AS PER CODE.$200,000May 16, 2024
COM2023SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: ADD (21) NEW VAV BOXES AND (21) STATS LOW VOLTAGE ONLY, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$16,400Feb 9, 2024
COM2024AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2023-01254:SCOPE OF WORK:---------EXTERIOR ALTERATIONS-------ALTERATIONS INCIDENTAL TO REPLACEMANT OF AIR HANDLING UNIT ON THE ROOF OF THE BURK BUILDING. MODIFICATIONS INCLUDE, NEW FLOOR PENETRATIONS AND METAL ENCLOSURE FOR MECHANICAL DUCTWORK RISERS. RECONFIGURATION OF WORKSTATIONS AND SUPPORT EQUIPMENT. PATCH EXISTING ROOF FOR INSTALLATION OF DUCTWORK ROOF TOP AIR-HANDLING UNIT, PLENUM, AND SUPPORTS. AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2023-01254) SCOPE OF WORK:---------EXTERIOR ALTERATIONS-------ALTERATIONS INCIDENTAL TO REPLACEMANT OF AIR HANDLING UNIT ON THE ROOF OF THE BURK BUILDING. MODIFICATIONS INCLUDE, NEW FLOOR PENETRATIONS AND METAL ENCLOSURE FOR MECHANICAL DUCTWORK RISERS. RECONFIGURATION OF WORKSTATIONS AND SUPPORT EQUIPMENT. PATCH EXISTING ROOF FOR INSTALLATION OF DUCTWORK ROOF TOP AIR-HANDLING UNIT, PLENUM, AND SUPPORTS. AS PER PLANS AS PER CODE. Jan 30, 2024
COM2023RELOCATING FIVE (5) QUICK RESPONSE CONCEALED SPRINKLERS TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATE CT SCAN ROOM AS PER PLANSAS PER CODE. $12,750Dec 13, 2023
COM2023MODIFY THE EXISTING SPRINKLER SYSTEM IN ACCORDANCE WITH THE NFPA13 AND THE AHJ. RELOCATED SPRINKLER HEADS= 39. NEW SPRINKLER HEADS= 02. AS PER PLANS AS PER CODE.$8,175Nov 22, 2023
COM2023INSTALL FIRE ALARM AS PER PLANS AS PER CODE.$12,368Nov 20, 2023
COM2023BFPE WILL INSTALL A WET-PIPE SPRINKLER SYSTEM (145 HEADS) ON THE MECHANICAL LEVEL OF THE MCAULEY TOWER AT MERCY MEDICAL CENTER.$200,000Oct 3, 2023
COM2023SCOPE OF WORK:---------EXTERIOR ALTERATIONS-------ALTERATIONS INCIDENTAL TO REPLACEMANT OF AIR HANDLING UNIT ON THE ROOF OF THE BURK BUILDING. MODIFICATIONS INCLUDE, NEW FLOOR PENETRATIONS AND METAL ENCLOSURE FOR MECHANICAL DUCTWORK RISERS. RECONFIGURATION OF WORKSTATIONS AND SUPPORT EQUIPMENT. PATCH EXISTING ROOF FOR INSTALLATION OF DUCTWORK ROOF TOP AIR-HANDLING UNIT, PLENUM, AND SUPPORTS. AS PER PLANS AS PER CODE. $4,000,000Sep 15, 2023
COM2023ADD 9 HEADS TO ACCOMMODATE THE TENANTS NEW LAYOUT AS PER PLANS AS PER CODE. $3,000Sep 14, 2023
COM2023INSTALL (70) # LOW VOLTAGE AS PER CODE.************* AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (13.2 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$20,000Sep 13, 2023
COM2023AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2023-01267:RENOVATION OF PORTIONS OF AN EXISTING HEALTHCARE SUITE WITHIN THE MCAULEY BUILDING ON THE MERCY HOSPITAL CAMPUS, PROVIDE ADDITIONAL EXAMINATION ROOMS, OFFICES, RECEPTION, WAITING, AND SUPPORT SPACES TO FACILITATE THIS EXPANSION.  SCOPE INCLUDES NEW INTERIOR WALLS, FLOORS, CASEWORK, EQUIPMENT, FLOORING, FINISHES AND CEILINGS THROUGHOUT THE TENANT SPACE.  ALSO INCLUDED IN THE INTERIOR FITOUT ARE NEW MECHANICAL, PLUMBING, ELECTRICAL AND LOW VOLTAGE SECURITY SYSTEMS WITHIN THE AREAS OF WORK. ASSOCIATED LIFE SAFETY MODIFICATIONS TO INCLUDE RELOCATING SUITE BOUNDARIES AND PROVIDING ELEVATOR HOISTWAY OPENING PROTECTION. NO WORK IS BEING DONE TO THE EXTERIOR OF THE BUILDING. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01267) RENOVATION OF PORTIONS OF AN EXISTING HEALTHCARE SUITE WITHIN THE MCAULEY BUILDING ON THE MERCY HOSPITAL CAMPUS, PROVIDE ADDITIONAL EXAMINATION ROOMS, OFFICES, RECEPTION, WAITING, AND SUPPORT SPACES TO FACILITATE THIS EXPANSION.  SCOPE INCLUDES NEW INTERIOR WALLS, FLOORS, CASEWORK, EQUIPMENT, FLOORING, FINISHES AND CEILINGS THROUGHOUT THE TENANT SPACE.  ALSO INCLUDED IN THE INTERIOR FITOUT ARE NEW MECHANICAL, PLUMBING, ELECTRICAL AND LOW VOLTAGE SECURITY SYSTEMS WITHIN THE AREAS OF WORK. ASSOCIATED LIFE SAFETY MODIFICATIONS TO INCLUDE RELOCATING SUITE BOUNDARIES AND PROVIDING ELEVATOR HOISTWAY OPENING PROTECTION. NO WORK IS BEING DONE TO THE EXTERIOR OF THE BUILDING. AS PER PLANS AS PER CODE.Sep 6, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-01267:RENOVATION OF PORTIONS OF AN EXISTING HEALTHCARE SUITE WITHIN THE MCAULEY BUILDING ON THE MERCY HOSPITAL CAMPUS, PROVIDE ADDITIONAL EXAMINATION ROOMS, OFFICES, RECEPTION, WAITING, AND SUPPORT SPACES TO FACILITATE THIS EXPANSION.  SCOPE INCLUDES NEW INTERIOR WALLS, FLOORS, CASEWORK, EQUIPMENT, FLOORING, FINISHES AND CEILINGS THROUGHOUT THE TENANT SPACE.  ALSO INCLUDED IN THE INTERIOR FITOUT ARE NEW MECHANICAL, PLUMBING, ELECTRICAL AND LOW VOLTAGE SECURITY SYSTEMS WITHIN THE AREAS OF WORK. ASSOCIATED LIFE SAFETY MODIFICATIONS TO INCLUDE RELOCATING SUITE BOUNDARIES AND PROVIDING ELEVATOR HOISTWAY OPENING PROTECTION. NO WORK IS BEING DONE TO THE EXTERIOR OF THE BUILDING. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01267) RENOVATION OF PORTIONS OF AN EXISTING HEALTHCARE SUITE WITHIN THE MCAULEY BUILDING ON THE MERCY HOSPITAL CAMPUS, PROVIDE ADDITIONAL EXAMINATION ROOMS, OFFICES, RECEPTION, WAITING, AND SUPPORT SPACES TO FACILITATE THIS EXPANSION.  SCOPE INCLUDES NEW INTERIOR WALLS, FLOORS, CASEWORK, EQUIPMENT, FLOORING, FINISHES AND CEILINGS THROUGHOUT THE TENANT SPACE.  ALSO INCLUDED IN THE INTERIOR FITOUT ARE NEW MECHANICAL, PLUMBING, ELECTRICAL AND LOW VOLTAGE SECURITY SYSTEMS WITHIN THE AREAS OF WORK. ASSOCIATED LIFE SAFETY MODIFICATIONS TO INCLUDE RELOCATING SUITE BOUNDARIES AND PROVIDING ELEVATOR HOISTWAY OPENING PROTECTION. NO WORK IS BEING DONE TO THE EXTERIOR OF THE BUILDING. AS PER PLANS AS PER CODE.Aug 10, 2023
COM2023RENOVATION OF PORTIONS OF AN EXISTING HEALTHCARE SUITE WITHIN THE MCAULEY BUILDING ON THE MERCY HOSPITAL CAMPUS, PROVIDE ADDITIONAL EXAMINATION ROOMS, OFFICES, RECEPTION, WAITING, AND SUPPORT SPACES TO FACILITATE THIS EXPANSION.  SCOPE INCLUDES NEW INTERIOR WALLS, FLOORS, CASEWORK, EQUIPMENT, FLOORING, FINISHES AND CEILINGS THROUGHOUT THE TENANT SPACE.  ALSO INCLUDED IN THE INTERIOR FITOUT ARE NEW MECHANICAL, PLUMBING, ELECTRICAL AND LOW VOLTAGE SECURITY SYSTEMS WITHIN THE AREAS OF WORK. ASSOCIATED LIFE SAFETY MODIFICATIONS TO INCLUDE RELOCATING SUITE BOUNDARIES AND PROVIDING ELEVATOR HOISTWAY OPENING PROTECTION. NO WORK IS BEING DONE TO THE EXTERIOR OF THE BUILDING. AS PER PLANS AS PER CODE.$12,000,000Aug 9, 2023
COM2023AMEND PERMIT: ADD PLUMBING AND HVAC CONTRACTOR. (ORIGINAL PERMIT:COM2023-00774: REPLACEMENT OF EXISTING GAMMA CAMERA WITH NEW SPEC CT CAMERA. PROVIDE NEW CONTROL ROOM, FINISHES AND MEP CONNECTIONS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.) Original Permit Description:(COM2023-00774) REPLACEMENT OF EXISTING GAMMA CAMERA WITH NEW SPEC CT CAMERA. PROVIDE NEW CONTROL ROOM, FINISHES AND MEP CONNECTIONS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.Aug 7, 2023
COM2023INSTALL (30) # LOW VOLTAGE AS PER CODE.$5,600Jul 26, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-00774:REPLACEMENT OF EXISTING GAMMA CAMERA WITH NEW SPEC CT CAMERA. PROVIDE NEW CONTROL ROOM, FINISHES AND MEP CONNECTIONS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.) Original Permit Description:(COM2023-00774) REPLACEMENT OF EXISTING GAMMA CAMERA WITH NEW SPEC CT CAMERA. PROVIDE NEW CONTROL ROOM, FINISHES AND MEP CONNECTIONS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.Jul 20, 2023
COM2023REPLACEMENT OF EXISTING GAMMA CAMERA WITH NEW SPEC CT CAMERA. PROVIDE NEW CONTROL ROOM, FINISHES AND MEP CONNECTIONS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.$1,000,000Jul 19, 2023
COM2023INSTALL (1) # LOW VOLTAGE AS PER CODE.******** AS PER PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE AT THE LOWEST POINT IS 10 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (11.5 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$3,200May 17, 2023
COM2023AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2023-00306:SCOPE OF WORK:----EQUIPMENT REPLACEMENT-----IN RENOVATED FLUOROSCOPY, CONTROL ROOM, RESTROOM AND DRESSING ROOMS. MODIFICATIONS INCLUDE DEMOLTITION OF EQUIPMENT AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING; INTERIOR FINISHES AND MILLWORK. NEW WORK INCLUDES INSTALLATION OF NEW FLUOROSCOPY EQUIPMENT, INTERIOR FINISHES, MILLWORK, ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-00306) SCOPE OF WORK:----EQUIPMENT REPLACEMENT-----IN RENOVATED FLUOROSCOPY, CONTROL ROOM, RESTROOM AND DRESSING ROOMS. MODIFICATIONS INCLUDE DEMOLTITION OF EQUIPMENT AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING; INTERIOR FINISHES AND MILLWORK. NEW WORK INCLUDES INSTALLATION OF NEW FLUOROSCOPY EQUIPMENT, INTERIOR FINISHES, MILLWORK, ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS AS PER PLANS AS PER CODE.May 16, 2023
COM2023INSTALL (75) # LOW VOLTAGE AS PER CODE.******** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS BETWEEN 14 AND 48 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (7.5 FT ABOVE NATURAL GRADE AT THE LOWEST GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$9,500Apr 26, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2023-00306:SCOPE OF WORK:----EQUIPMENT REPLACEMENT-----IN RENOVATED FLUOROSCOPY, CONTROL ROOM, RESTROOM AND DRESSING ROOMS. MODIFICATIONS INCLUDE DEMOLTITION OF EQUIPMENT AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING; INTERIOR FINISHES AND MILLWORK. NEW WORK INCLUDES INSTALLATION OF NEW FLUOROSCOPY EQUIPMENT, INTERIOR FINISHES, MILLWORK, ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-00306) SCOPE OF WORK:----EQUIPMENT REPLACEMENT-----IN RENOVATED FLUOROSCOPY, CONTROL ROOM, RESTROOM AND DRESSING ROOMS. MODIFICATIONS INCLUDE DEMOLTITION OF EQUIPMENT AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING; INTERIOR FINISHES AND MILLWORK. NEW WORK INCLUDES INSTALLATION OF NEW FLUOROSCOPY EQUIPMENT, INTERIOR FINISHES, MILLWORK, ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS AS PER PLANS AS PER CODE.Apr 10, 2023
COM2023SCOPE OF WORK:----EQUIPMENT REPLACEMENT-----IN RENOVATED FLUOROSCOPY, CONTROL ROOM, RESTROOM AND DRESSING ROOMS. MODIFICATIONS INCLUDE DEMOLTITION OF EQUIPMENT AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING; INTERIOR FINISHES AND MILLWORK. NEW WORK INCLUDES INSTALLATION OF NEW FLUOROSCOPY EQUIPMENT, INTERIOR FINISHES, MILLWORK, ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS AS PER PLANS AS PER CODE.$1,000,000Apr 6, 2023
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-71491:INSTALL (120) # LOW VOLTAGE, (200) # LOW VOLTAGE AS PER CODE. *NOT FIRE ALARM RELATED**** AS PER PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) IS 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 18.1 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (9.8 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.) Original Permit Description:(COM2022-71491) INSTALL (120) # LOW VOLTAGE, (200) # LOW VOLTAGE AS PER CODE. *NOT FIRE ALARM RELATED**** AS PER PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) IS 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 18.1 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (9.8 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.Mar 24, 2023
COM2022SCOPE OF WORK:----LEVEL II INTERIOR ALTERATIONS----RENOVATION OF 2ND FLOOR MCAULEY BUILDING TO EXPAND EXISTING PATHOLOGY LABORATORY, INCLUDES DEMOLITION OF CURRENT UNOCCUPIED SPACE FOR EXPANSION OF EXISTING ADJACENT ROOMS, DEMOLITION AND INSTALLATION OF PARTITIONS, CEILING, FINISHS, MECHANICAL, ELECTRCIAL, PLUMBING WORK AS PER PLANS AS PER CODE.$347,000Feb 22, 2023
COM2023 Extend Original Permit.(original permit:COM2022-78365:INSTALL (2) # LOW VOLTAGE AS PER CODE.*** PER PLANNING DEPT: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 19.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (11.2 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.***) Original Permit Description:(COM2022-78365) INSTALL (2) # LOW VOLTAGE AS PER CODE.*** PER PLANNING DEPT: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 19.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (11.2 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.***Jan 30, 2023
COM2022RELOCATING 3 AND ADDING 8 HEADS TO ACCOMMODATE THE NEW LAYOUT AS PER PLANS AS PER CODE.$11,900Nov 29, 2022
COM2022RELOCATE 6 HEADS TO ACCOMMODATE THE NEW LAYOUT AS PER PLANS AS PER CODE.$6,000Nov 1, 2022
COM2022INSTALL (2) # LOW VOLTAGE AS PER CODE.*** PER PLANNING DEPT: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 8.3 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 19.5 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (11.2 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.***$8,493Sep 6, 2022
COM2022AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2022-01894:AMEND COM2021-0390 PLAN 2021-2836 ISSUED 1/20/2022 TO THE 3T MRI EQUIPMENT REPLACEMENT PROJECT, WORK NOW INCLUDES THE MRI 1.5T EQUIPMENT REPLACEMENT AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01894) AMEND COM2021-0390 PLAN 2021-2836 ISSUED 1/20/2022 TO THE 3T MRI EQUIPMENT REPLACEMENT PROJECT, WORK NOW INCLUDES THE MRI 1.5T EQUIPMENT REPLACEMENT AS PER PLANS AS PER CODE.Aug 22, 2022
COM2022AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-01894:AMEND COM2021-0390 PLAN 2021-2836 ISSUED 1/20/2022 TO THE 3T MRI EQUIPMENT REPLACEMENT PROJECT, WORK NOW INCLUDES THE MRI 1.5T EQUIPMENT REPLACEMENT AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01894) AMEND COM2021-0390 PLAN 2021-2836 ISSUED 1/20/2022 TO THE 3T MRI EQUIPMENT REPLACEMENT PROJECT, WORK NOW INCLUDES THE MRI 1.5T EQUIPMENT REPLACEMENT AS PER PLANS AS PER CODE.Aug 22, 2022
COM2022AMEND COM2021-0390 PLAN 2021-2836 ISSUED 1/20/2022 TO THE 3T MRI EQUIPMENT REPLACEMENT PROJECT, WORK NOW INCLUDES THE MRI 1.5T EQUIPMENT REPLACEMENT AS PER PLANS AS PER CODE.$2,000,000Aug 18, 2022

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.