Baltimore City · 21201
233 N CHARLES ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $2,437,600
- Land use
- Exempt Commercial (EC)
- Year built
- 1890
- Last sale
- Jan 1, 1797
Assessment
| Owner | ST PAULS P E CHURCH |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $2,437,600 (cycle 2026) |
| Last sale | Jan 1, 1797 |
| Year built | 1890 |
| Zoning | C-5HT |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | SCOPE OF WORK: ---- FENCE ------ - Addition of a decorative metal security fence with gates across the front portico of the existing church building. The fence will include folding and stacking gates at openings along the existing stairs and an ADA compliant swinging gate with a rim exit device at the existing ramp. AS PER PLAN AND AS PER CODE ********* This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal ****** | $40,000 | May 19, 2026 |
| COM2021 | AS PER CHAP:REPAIR DETERIORATED BROWNSTONE COLUMN USING LITHOMEX REPAIR MORTAR TO MATCH COLOR, TEXTURE, AND DETAILS. REPAIR FIRE DAMAGE FROM DISCRETE PORTION OF STONE ON FAÇADE USING MND80 TO CLEAN THE STONE WHERE FEASIBLE AND LITHOMEX LIMESTONE REPAIR MORTAR WHERE NEEDED TO MATCH COLOR AND TEXTURE. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES | $3,000 | Aug 17, 2021 |
| COM2020 | *AUTHORIZATION TO PROCEED* CITY LANDMARKS - APPROVED AS PER CHAP ATP: REPOINT DETERIORATED MORTAR JOINTS ON THE NORTH ELEVATION OF BUILDING, BETWEEN GROUND LEVEL UP TO TWO FEET ABOVE THE GROUND. REPOINT USING MORTAR THAT MATCHES HISTORIC MORTAR IN COMPOSITION, COLOR, TEXTURE, AND JOINT PROFILE. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES. (RE-POINT BOTTOM OF NORTH SIDE DETERIORATED MORTAR JOINTS, 1ST (FIRST) 1-2’ (ONE TO TWO FEET) HIGH ALONG TOTAL WALL. AS MUCH AS CAN BE COMPLETED IN 6 DAYS. ALL NEW MATERIALS USED TO MATCH THAT OF PRE-EXISTING AS CLOSELY AS POSSIBLE. ALL WORK ON PRIVATE PROPERTY. NO SCAFFOLDING REQUIRED; GROUND WORK. NO INFRINGEMENT INTO RIGHT OF WAY. NO DRAWINGS AVAILABLE, SO A PHOTO OF THE AREA IS ATTACHED. POLLUTION CONTROL FORM ATTACHED. ATP HAS BEEN SUBMITTED TO CHAP. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE) | $7,000 | Oct 5, 2020 |
| COM2019 | exterior ramp on front of existing church building from sidewalk to portico and from portico to first floor as per plans and as per code. | $110,000 | Dec 18, 2019 |
| COM2019 | repair brownstone base at south tower, using lithomex, a hydraulic lime-based stone repair product or equal to match existing in color and composition and replicating features that previously existed based on historic images. repair dark brown stone at marble steps and clean and polish marble steps at ramp area. construct 2 new ada-compliant ramps for access on front elevation. the ramp from the sidewalk to the portico will be installed as per plans, will not damage the existing marble steps, and will be separated from the brownstone foundation by 2”. the cast concrete veneer face will match the adjacent brownstone foundation in color and will have a decorative metal handrail. the ramp on the portico will be installed onto of a liquid-rubber crack isolation membrane which will not damage the underlying stone tile. the ramp will be secured to the masonry wall using expanstion anchors in mortar joints in the masonry wall and portico floor as needed. the applicant must coordinate with chap staff archeologist to be present onsite when the foundations for the ramp are excavated. all work to be completed as per plans in chap files. scope of work: exterior alterations to include: on right side, repair limestone. repair brownstone at marble steps. clean and polish marble steps at area way where future ramp will be added. all new materials used to match that of original. all groundwork with no scaffolding needed. all work on private property. pollution control form attached. all work will be done according to baltimore city code. | $7,300 | Oct 21, 2019 |
Violations
2| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| service_request | HCD-Maintenance Structure | Closed | — | — | Apr 18, 2026 |
| citation | PM 305.1 | O | $100 | $300 | Sep 28, 2016 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BUSEJul 10, 2026 · 147 m · 100 N CHARLES ST
- permit: BCCMJul 7, 2026 · 55 m · 222 SAINT PAUL PL
- violation: HCD-Sanitation PropertyJul 6, 2026 · 68 m · 300 N CHARLES ST
- violation: SW-Dirty AlleyJul 6, 2026 · 129 m · 16 W SARATOGA ST
- violation: HCD-Maintenance StructureJun 29, 2026 · 51 m
- violation: HCD-Maintenance StructureJun 29, 2026 · 68 m · 300 N CHARLES ST
- violation: HCD-Maintenance StructureJun 29, 2026 · 68 m · 300 N CHARLES ST
- permit: BCCMJun 23, 2026 · 55 m · 222 SAINT PAUL PL
- violation: HCD-Maintenance StructureJun 23, 2026 · 122 m
- violation: HCD-Maintenance StructureJun 21, 2026 · 122 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.