Baltimore City · 21202

20 E FAYETTE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$1,430,400
Land use
Commercial (C)
Year built
1920
Last sale
Aug 9, 2021

Assessment

Owner20-22 E FAYETTE LLC
Land useCommercial (C)
Total assessment$1,430,400 (cycle 2026)
Last saleAug 9, 2021 — $1,400,000
Year built1920
ZoningC-5TO
Vacant

Permits

12
TypeDescriptionCostIssued
BRCMScrape cornice, clean up and removal during scraping and repaint. All work to be performed according to Baltimore city code regulations.$500Apr 15, 2025
USE2022USE FIRST FLOOR OF 22 E FAYETTE AS HEALTH-CARE CLINICFeb 17, 2023
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-01624:SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.) Original Permit Description:(COM2022-01624) SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.Feb 6, 2023
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-01624:SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.) Original Permit Description:(COM2022-01624) SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.Feb 1, 2023
COM2022FIRE ALARM PERMIT, THERE WILL BE A TOTAL OF 15 DEVICES 1SMOKE,10 STROBES,1 PULL STATION AND 3 HORN STROBES AS PER PLANS AS PER CODE.$20,000Jan 13, 2023
COM2022MODIFY EXISTING FIRE SPRINKLER SYSTEM BY ADDING 4 AND RELOCATING 23 SPRINKLERS TO ACCOMMODATE NEW INTERIOR ALTERATIONS. ALL WORK UNDER NFPA 13-2016, LARGEST NEW PIPE 1.25'' FIRE PUMP ON SITE. PLANS, PUMP TEST, AND CALCULATIONS PROVIDED, MATCH EXISTING LIGHT AND ORDINARY HAZARD AS PER PLANS AS PER CODE.$13,900Oct 7, 2022
COM2022INSTALL (1) 60000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 200 CFM EXHAUST SYSTEMS , (4) # PLUMBING FIXTURES AS PER CODE.$16,000Jul 29, 2022
COM2022INSTALL (15) # LOW VOLTAGE AS PER CODE.$10,000Jul 29, 2022
COM2022AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2022-01624:SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.) Original Permit Description:(COM2022-01624) SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.Jul 22, 2022
COM2022SCOPE OF WORK:---INTERIOR ALTERATIONS----TENANT IMPROVEMENT OF A VACANT SPACE ON THE GROUND FLOOR OF A BUILDING (TO BE USED FOR MEDICAL OFFICE SPACE AS AN OUTPATIENT THERAPY CENTER) INCLUDE MINOR DEMOLITION TO THE EXISTING WALLS AND ENCLOSURES IN THE TENANT AREA FOR THE CONSTRUCTION OF NEW TREATMENT AND THERAPY ROOMS, TWO NEW TOILET ROOMS, AND VARIOUS STORAGE CLOSETS AS PER PLANS AS PER CODE. THE EXISTING MECHANICAL SYSTEM SHALL BE RE-USED, BUT RE-DUCTED TO NEW REGISTERS AS INDICATED. ELECTRICAL REVISIONS SHALL INCLUDE NEW LIGHTING, SWITCHES, AND OUTLETS TO MEET THE NEW LAYOUT. PLUMBING REVISIONS INCLUDE TRENCHING AND SANITARY TIE IN FOR THE PROPOSED ADA TOILET ROOM AND SECONDARY TOILET.$20,000Jun 13, 2022
USE2022USE AS FORTY-NINE (49) DWELLING UNITS [2ND FLOOR - 10 DWELLING UNITS 3RD FLOOR - 11 DWELLING UNITS 4TH FLOOR - 7 DWELLING UNITS 5TH FLOOR - 7 DWELLING UNITS 6TH FLOOR - 7 DWELLING UNITS 7TH FLOOR - 7 DWELLING UNITS]Apr 1, 2022
COM2021INSTALL (1) # GAS TEST AS PER CODE.$1,000Nov 1, 2021

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.