Baltimore City · 21213
2833 LAKE AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $205,933
- Land use
- Residential (R)
- Year built
- 1927
- Last sale
- Aug 17, 2022
Assessment
| Owner | HUDSON, DANIEL ARTHUR |
|---|---|
| Land use | Residential (R) |
| Total assessment | $205,933 (cycle 2026) |
| Last sale | Aug 17, 2022 — $205,000 |
| Year built | 1927 |
| Zoning | R-7 |
| Vacant | — |
Permits
12| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2022 | INSTALL (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE. | $7,000 | Aug 4, 2022 |
| USE2022 | USE AS A SINGLE-FAMILY DWELLING. | — | Jun 1, 2022 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-88978:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS: INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT) INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS, INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK) Original Permit Description:(COM2020-88978) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS: INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT) INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS, INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | May 18, 2022 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-50728:INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2021-50728) INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | May 5, 2022 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-50728:INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2021-50728) INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 26, 2022 |
| COM2021 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 90000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $4,500 | Dec 26, 2021 |
| COM2021 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-50728:INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2021-50728) INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Dec 26, 2021 |
| COM2021 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: INSTALL RUBBER ROOF AND GUTTERS SIDING ON REAR ADDTION (200 SQ/FT), *NO STRUCTURAL ALTERATIONS TO BE DONE TO THE ADDITION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $4,500 | Dec 17, 2021 |
| COM2021 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-88978:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS: INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT) INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS, INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK) Original Permit Description:(COM2020-88978) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS: INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT) INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS, INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | Nov 30, 2021 |
| COM2021 | INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # FIXTURES/DEVICES, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | $3,000 | Jan 9, 2021 |
| COM2020 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS: INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT) INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS, INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | $3,000 | Jan 5, 2021 |
| COM2020 | INSTALL (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $500 | Dec 17, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 1, 2026 · 105 m
- violation: SW-Dirty AlleyJun 30, 2026 · 119 m
- violation: PM 305.3Jun 29, 2026 · 142 m · 3300 BELAIR RD
- permit: BRCMJun 24, 2026 · 80 m · 2825 MAYFIELD AVE
- violation: SW-Dirty AlleyJun 23, 2026 · 92 m · 2859 MAYFIELD AVE
- violation: HCD-Illegal DumpingJun 22, 2026 · 143 m · 2924 ERDMAN AVE
- violation: SW-Dirty AlleyJun 16, 2026 · 74 m · 2837 MAYFIELD AVE
- permit: BRCMJun 16, 2026 · 75 m · 2858 LAKE AVE
- violation: PM 305.2.2Jun 16, 2026 · 104 m · 3402 BELAIR RD
- violation: HCD-Zoning InvestigationJun 16, 2026 · 142 m · 3428 BELAIR RD
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.