Baltimore City · 21217

134 W LANVALE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$590,133
Land use
Residential (R)
Year built
1850
Last sale
Dec 21, 2017

Assessment

OwnerSULLIVAN, PETER J
Land useResidential (R)
Total assessment$590,133 (cycle 2026)
Last saleDec 21, 2017
Year built1850
ZoningR-7
Vacant

Permits

4
TypeDescriptionCostIssued
COM2023INSTALL (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE.$1,000Nov 27, 2023
COM2023INSTALL (1) # PLUMBING FIXTURES AS PER CODE.$2,500Nov 27, 2023
COM2023INSTALL (8) # BRANCH CIRCUITS/FEEDERS AS PER CODE.$400Nov 2, 2023
COM2023SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS WORK SCOPE TO INCLUDE NEW WALLS AND DRYWALL/PLASTER WORK. INSTALLATION OF NEW CABINETS AND COUNTERS, CARPENTRY, PAINT AND TRIM WORK, AND FLOORING INSTALL. REPLACEMENT OF WINDOWS AND DOOR INSTALLATION (WITHIN EXISTING OPENINGS), REPLACEMENT OF DECKING MATERIALS AND RAILING (MINIMUM HEIGHT: 36''/MAXIMUM SPACING: 4''), PAINTING, *NO STRUCTURAL ALTERATIONS TO BE DONE TO THE DECK. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. PER CHAP ATP: ON SIDE (JOHN STREET) ELEVATION, REPLACE TWO WINDOWS ON 1ST STORY THAT ARE A LEAD-BASED PAINT HAZARD WITH NEW 1/1 MARVIN WOOD WINDOWS TO MATCH THE SIZE, OPERATION AND DAYLIGHT OPENING OF THE EXISTING WINDOW. NEW WINDOW FRAMES TO MATCH DIMENSIONS AND PROFILE AS THE HISTORIC FRAMES. WINDOW TRIM AND FRAMES TO BE PAINTED SHERWIN WILLIAMS “TRICORN BLACK.” ON THE REAR ELEVATION, REPLACE 1ST STORY DOOR AND WINDOW WITH NEW CUSTOM FRENCH DOOR SYSTEM WITH A BLACK ALUMINUM FRAME AND 4 LIGHTS IN EACH PANEL. BRICK ARCHES OVER REAR DOOR AND WINDOW TO BE RETAINED WITH NEW STEEL LINTEL BELOW. TOOTH IN MATCHING BRICK WHERE NEEDED. NEW MORTAR TO MATCH THE HISTORIC MORTAR IN COLOR, TEXTURE, JOINT PROFILE AND MATERIAL COMPOSITION. REPLACE DETERIORATED 3-STORY REAR DECK WITH NEW 3-STORY DECK IN SAME LOCATION WITH WOOD RAILINGS AND NEWEL POSTS. NON-ORIGINAL METAL COLUMNS TO BE REPLACED WITH WOOD COLUMN WITH COMPOSITE TRIM. REPLACE REAR METAL STAIRCASE WITH NEW WOOD STAIRCASE. PORCH DECKING AND STAIR TREADS TO BE AERATIS COMPOSITE PORCH FLOORING. ADD NEW HORIZONTAL BOARDS AND SMALL GATE BELOW 1ST STORY DECK. ALL WORK TO BE COMPLETED AS PER SUBMISSION ITEMS AND PLANS IN CHAP EXCEPT WHERE THIS ATP SUPERSEDES.$150,000Jun 22, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.