Total assessment
$569,067
Land use
Residential (R)
Year built
1920
Last sale
Dec 13, 2022

Assessment

OwnerPOOLE, KIRSTEN
Land useResidential (R)
Total assessment$569,067 (cycle 2026)
Last saleDec 13, 2022 — $485,000
Year built1920
ZoningOR-1
Vacant

Permits

7
TypeDescriptionCostIssued
COM2024 Extend Original Permit.(original permit:COM2023-83754:REMOVE & HAUL EXISTING NON-STRUCTURAL WALLS IN BASEMENT. FRAME NEW 2X4 WOOD WALLS, 16" O/C, ON BASEMENT AND 1ST FLOOR. NEW DRYWALL AND TRIMS. AS PER PLANS AND AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2023-83754) REMOVE & HAUL EXISTING NON-STRUCTURAL WALLS IN BASEMENT. FRAME NEW 2X4 WOOD WALLS, 16" O/C, ON BASEMENT AND 1ST FLOOR. NEW DRYWALL AND TRIMS. AS PER PLANS AND AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)May 13, 2024
COM2024INSTALL (280) # FIXTURES/DEVICES, (42) # BRANCH CIRCUITS/FEEDERS , (1) 400 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (2) 200 AMPS RELOCATE ELECTRICAL METERS AS PER CODE.$85,000Apr 16, 2024
COM2024INSTALL (3) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 320 CFM EXHAUST SYSTEMS , (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (22) # PLUMBING FIXTURES, (2) # ELECTRIC WATER HEATER, (4) 450000 BTU FUEL-BURNING EQUIP AS PER CODE.$30,000Mar 22, 2024
COM2024 Extend Original Permit.(original permit:COM2023-68013:DEMO / REBUILD EXISTING 1ST FLOOR REAR DECKS (16' X 10'-2'') W/ STAIRCASE TO EXISTING GRADE, DEMO / REBUILD EXISTING 2ND FLOOR REAR DECK (12'-8'' X 7') W/ STAIRCASE, DEMO / REBUILD EXISTING 3RD FLOOR REAR DECK (16' X 7'), AS PER PLANS, AS PER CODE.*** PER CHAP: ATP: RETROACTIVE APPROVAL FOR REMOVAL OF TREE IN REAR YARD. DEMOLISH 3-STORY WOODEN PORCH ON REAR ELEVATION DUE TO POOR CONDITION AND UNDERSIZED FOOTINGS. THE THIRD FLOOR PORCH ROOF WILL BE RETAINED. RECONSTRUCT THE PORCH AND STAIRCASES BETWEEN THE FLOORS TO MATCH EXISTING IN DIMENSIONS, WITH THE PORCH DIMENSIONS OF 7’ DEEP BY 16’. THE STAIRCASE FROM THE SECOND FLOOR TO THE FIRST FLOOR EXTENDS AN ADDITIONAL 3’ TO THE REAR OF THE LOT AND 3’3” TO THE NORTH. THE STAIRS TO THE GROUND LEVEL ARE BEING RELOCATED AS SHOWN IN PLANS. THE RAILINGS, DECKING, STAIRS, AND FRAMING WILL ALSO BE PRESSURE TREATED WOOD, TO MATCH EXISTING IN DETAILS. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES.*** ) Original Permit Description:(COM2023-68013) DEMO / REBUILD EXISTING 1ST FLOOR REAR DECKS (16' X 10'-2'') W/ STAIRCASE TO EXISTING GRADE, DEMO / REBUILD EXISTING 2ND FLOOR REAR DECK (12'-8'' X 7') W/ STAIRCASE, DEMO / REBUILD EXISTING 3RD FLOOR REAR DECK (16' X 7'), AS PER PLANS, AS PER CODE.*** PER CHAP: ATP: RETROACTIVE APPROVAL FOR REMOVAL OF TREE IN REAR YARD. DEMOLISH 3-STORY WOODEN PORCH ON REAR ELEVATION DUE TO POOR CONDITION AND UNDERSIZED FOOTINGS. THE THIRD FLOOR PORCH ROOF WILL BE RETAINED. RECONSTRUCT THE PORCH AND STAIRCASES BETWEEN THE FLOORS TO MATCH EXISTING IN DIMENSIONS, WITH THE PORCH DIMENSIONS OF 7’ DEEP BY 16’. THE STAIRCASE FROM THE SECOND FLOOR TO THE FIRST FLOOR EXTENDS AN ADDITIONAL 3’ TO THE REAR OF THE LOT AND 3’3” TO THE NORTH. THE STAIRS TO THE GROUND LEVEL ARE BEING RELOCATED AS SHOWN IN PLANS. THE RAILINGS, DECKING, STAIRS, AND FRAMING WILL ALSO BE PRESSURE TREATED WOOD, TO MATCH EXISTING IN DETAILS. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES.*** Feb 13, 2024
COM2023REMOVE & HAUL EXISTING NON-STRUCTURAL WALLS IN BASEMENT. FRAME NEW 2X4 WOOD WALLS, 16'' O/C, ON BASEMENT AND 1ST FLOOR. NEW DRYWALL AND TRIMS. AS PER PLANS AND AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)$10,000Oct 28, 2023
COM2023DEMO / REBUILD EXISTING 1ST FLOOR REAR DECKS (16' X 10'-2'') W/ STAIRCASE TO EXISTING GRADE, DEMO / REBUILD EXISTING 2ND FLOOR REAR DECK (12'-8'' X 7') W/ STAIRCASE, DEMO / REBUILD EXISTING 3RD FLOOR REAR DECK (16' X 7'), AS PER PLANS, AS PER CODE.*** PER CHAP: ATP: RETROACTIVE APPROVAL FOR REMOVAL OF TREE IN REAR YARD. DEMOLISH 3-STORY WOODEN PORCH ON REAR ELEVATION DUE TO POOR CONDITION AND UNDERSIZED FOOTINGS. THE THIRD FLOOR PORCH ROOF WILL BE RETAINED. RECONSTRUCT THE PORCH AND STAIRCASES BETWEEN THE FLOORS TO MATCH EXISTING IN DIMENSIONS, WITH THE PORCH DIMENSIONS OF 7’ DEEP BY 16’. THE STAIRCASE FROM THE SECOND FLOOR TO THE FIRST FLOOR EXTENDS AN ADDITIONAL 3’ TO THE REAR OF THE LOT AND 3’3” TO THE NORTH. THE STAIRS TO THE GROUND LEVEL ARE BEING RELOCATED AS SHOWN IN PLANS. THE RAILINGS, DECKING, STAIRS, AND FRAMING WILL ALSO BE PRESSURE TREATED WOOD, TO MATCH EXISTING IN DETAILS. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES.*** $8,000Jul 18, 2023
COM2023ON FRONT OF HOUSE, REPAIR RIGHT CORNER RAIN GUTTER AFTER GUTTER IS REMOVED. ON FRONT OF HOUSE, CLEAN TOTAL VENEER FROM GROUND, INCLUDING STEPS, TO TOP. RE-POINTING DETERIORATED MORTAR JOINTS THROUGHOUT, SEALING AROUND WINDOWS. ALL NEW MATERIALS USED TO MATCH THAT OF PRE-EXISTING AS CLOSELY AS POSSIBLE. ALL WORK ON PRIVATE PROPERTY WITH NO INFRINGEMENT INTO RIGHT OF WAY. ANY SCAFFOLDING USED WILL BE SET OUTSIDE RIGHT OF WAY. POLLUTION CONTROL FORM ATTACHED. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE********* AS PER CHAP: BOLTON HILL - APPROVED AS PER CHAP ATP: MASONRY REPAIRS ON FAÇADE. TEMPORARILY REMOVE GUTTER AND REPAIR MASONRY BEHIND THE GUTTER, REINSTALL THE GUTTER. CLEAN ENTIRE STONE FAÇADE INCLUDING STEPS USING GENTLE NON-IONIC CLEANSERS. REPOINT DETERIORATED MORTAR JOINTS, USING MORTAR TO MATCH THE HISTORIC MORTAR IN COMPOSITION, COLOR, AND JOINT PROFILE. INSTALL CAULK AROUND THE WINDOWS. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES. $13,000May 17, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.