Baltimore City · 21217

1648 N FULTON AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$15,000
Land use
Residential (R)
Year built
1920
Last sale
Nov 12, 2025

This owner holds 28 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerANGEL CONSTRUCTION INVESTMENT LLC
Land useResidential (R)
Total assessment$15,000 (cycle 2026)
Last saleNov 12, 2025 — $13,200
Year built1920
ZoningR-7
VacantYes

Permits

4
TypeDescriptionCostIssued
BRCMScope of work: complete Alteration. (category 1 Interior Demolition through-out) Nonstructural drywall to accommodate R21 wall Insulation and R49 attic insulation, Install 1/2" sheetrock (Walls and Ceilings), spackle finish and Paint. Laminate all Floors with waterproof Vinyl Flooring. Install ceramic Tiles in all Bathroom floors and partial walls. Install 6 Replacement Windows In Existing Frames. Install 3 Entrance Doors (No change in size). In stall 12 Interior Closet Doors. Install All new Kitchen Cabinets and countertops. All work will be completed according to code. Replace 4 damages floor joists, frame bulk heads using 2x4 around duct and plumbing pipes Approved For Work Only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. Separate permit will be required for electrical, mechanical, and plumbing work. As per code$80,000Feb 24, 2026
BRCMTHE SCOPE OF WORK FOR THIS PROJECT INCLUDES LIMITED DEMOLITION, MODIFICATIONS, AND NEW CONSTRUCTION WORK REQUIRED FOR THE REMODELING OF THE PROPERTY, IN ACCORDANCE WITH THE PROPOSED ARCHITECTURAL AND STRUCTURAL PLANS. AT THE BASEMENT LEVEL, NO EXISTING WALLS WILL BE DEMOLISHED; HOWEVER, THE EXISTING CEILINGS ARE COLLAPSED AND WILL BE FULLY DEMOLISHED AND REPLACED WITH NEW CEILING SYSTEMS IN ACCORDANCE WITH THE PROPOSED PLANS. ONLY THE EXISTING WINDOW FRAMES WILL BE REMOVED TO ALLOW THE INSTALLATION OF NEW WINDOWS IN ACCORDANCE WITH THE PROPOSED PROJECT. IN ADDITION, A LOCALIZED DEMOLITION WILL BE PERFORMED ON AN EXISTING WALL TO CREATE A NEW OPENING FOR AN EGRESS WINDOW, AS INDICATED ON THE PLANS. THIS LEVEL INCLUDES THE CONSTRUCTION OF NEW STAIRS IN ACCORDANCE WITH THE CONFIGURATION SHOWN ON THE PROPOSED PLANS, AS WELL AS THE CONSTRUCTION OF NEW INTERIOR PARTITIONS TO FORM THE INDICATED SPACES, INCLUDING BEDROOMS, BATHROOMS, SERVICE AREAS, AND CIRCULATION AREAS. NEW EGRESS WINDOWS WILL BE INSTALLED IN ALL BEDROOMS, IN COMPLIANCE WITH APPLICABLE CODES, AND ALL REQUIRED FRAMING, HEADERS, AND STRUCTURAL REINFORCEMENTS WILL BE COMPLETED IN ACCORDANCE WITH THE STRUCTURAL PLANS, WITHOUT AFFECTING EXISTING STRUCTURAL ELEMENTS BEYOND WHAT IS INDICATED. AT THE GROUND LEVEL, NO WALL DEMOLITION WILL OCCUR; HOWEVER, THE EXISTING CEILINGS ARE COLLAPSED AND WILL BE FULLY DEMOLISHED AND REPLACED WITH NEW CEILING SYSTEMS IN ACCORDANCE WITH THE PROPOSED ARCHITECTURAL AND STRUCTURAL PLANS. ONLY EXISTING DOORS AND WINDOW FRAMES WILL BE REMOVED AND REPLACED WITH NEW UNITS IN ACCORDANCE WITH THE PROPOSED ARCHITECTURAL DESIGN. STAIRS WILL BE CONSTRUCTED AND/OR RECONFIGURED AS SHOWN IN THE PROPOSED PLANS TO ENSURE PROPER CONNECTION BETWEEN LEVELS. THE NEW INTERIOR LAYOUT SHOWN ON THE PROPOSED PLANS WILL BE EXECUTED AT THIS LEVEL, INCLUDING HABITABLE AREAS, KITCHEN, BATHROOMS, AND SERVICE SPACES, THROUGH THE CONSTRUCTION OF NEW INTERIOR PARTITIONS, INSTALLATION OF NEW DOORS AND WINDOWS, AND COMPLETION OF ALL ASSOCIATED FINISHES. ALL EXISTING OPENINGS WILL BE MAINTAINED, EXCEPT FOR MINOR ADJUSTMENTS NECESSARY FOR PROPER INSTALLATION OF THE NEW ELEMENTS. AT THE UPPER LEVEL, NO WALL DEMOLITION WILL BE PERFORMED; HOWEVER, THE EXISTING CEILINGS ARE COLLAPSED AND WILL BE DEMOLISHED AND REPLACED WITH NEW CEILING SYSTEMS IN ACCORDANCE WITH THE PROPOSED PLANS. ONLY THE EXISTING WINDOW FRAMES WILL BE REMOVED AND REPLACED WITH NEW WINDOWS IN ACCORDANCE WITH THE PROPOSED PLANS. ADDITIONALLY, A LOCALIZED DEMOLITION WILL BE PERFORMED ON AN EXISTING WALL TO CREATE A NEW OPENING FOR A NEW EGRESS WINDOW, AS INDICATED IN THE PROPOSAL. NEW STAIRS WILL BE CONSTRUCTED IN ACCORDANCE WITH THE PROPOSED PLANS, AND THE INTERIOR REDISTRIBUTION WILL BE COMPLETED TO FORM THE INDICATED BEDROOMS, BATHROOMS, CLOSETS, AND CIRCULATION AREAS. ALL BEDROOMS AT THIS LEVEL WILL BE PROVIDED WITH EGRESS WINDOWS IN ACCORDANCE WITH THE PROPOSED PLANS AND APPLICABLE CODE REQUIREMENTS. THROUGHOUT ALL LEVELS, THE NEW CONSTRUCTION WORK WILL INCLUDE INTERIOR WALLS, DOORS, WINDOWS, STAIRS, NEW CEILING SYSTEMS, BATHROOM FINISHES, AND HABITABLE AREA FINISHES, ALL EXECUTED IN ACCORDANCE WITH THE SPECIFICATIONS, GENERAL NOTES, LEGENDS, AND DETAILS CONTAINED IN THE PROPOSED ARCHITECTURAL AND STRUCTURAL PLANS. WINDOW REPLACEMENT SHALL INCLUDE NEW VINYL SLIDING, DOUBLE-HUNG, OR EGRESS WINDOWS AS APPLICABLE, MAINTAINING EXISTING OPENINGS OR CREATING NEW OPENINGS WHERE SPECIFICALLY INDICATED ON THE PLANS. THE CONTRACTOR SHALL COORDINATE MATERIALS, DIMENSIONS, AND EXISTING FIELD CONDITIONS, COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS, AND ENSURE THAT THE SCOPE DESCRIBED REPRESENTS THE COMPLETE WORK REQUIRED TO COMPLETE THE REMODEL IN ACCORDANCE WITH THE APPROVED DESIGN. Separate permit will be required for electrical, mechanical, and plumbing work. As per plans and as per code.$85,000Jan 5, 2026
BRCMScope of Work: A non-structural demolition will be carried out inside the residence, which will include the removal of the concrete slab of the basement as required, as well as all interior and exterior doors and all windows. No structural elements will be altered, and all debris, including that found in the backyard, will be properly removed and disposed of in accordance with local codes of Baltimore City.$8,000Dec 1, 2025
BRCMSCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ---------: INTERIOR DEMOLITION (CATEGORY 2): RENOVATE KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT), INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS. ------EXTERIOR ALTERATIONS ------ INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). Replace rear fence planks same size and location 20 ft 1x6x6 Repair front and rear steps same size and location and install handrails ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. *******SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK ******* Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.$25,400Oct 20, 2025

Violations

4
KindCategoryStatusFineBalanceDate
vacant_building_noticeVacantopenFeb 10, 2026
citationBC 123.8.1P$1,000$0Apr 24, 2025
citationBC 123.8.1P$1,000$0Jul 30, 2024
citationBC 123.8.1P$1,000$0Nov 30, 2023

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.