Baltimore City · 21230

219 E MONTGOMERY ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$450,600
Land use
Residential (R)
Year built
1825
Last sale
Feb 12, 1997

Assessment

OwnerHAYS, ALMA
Land useResidential (R)
Total assessment$450,600 (cycle 2026)
Last saleFeb 12, 1997 — $250,000
Year built1825
ZoningR-7
Vacant

Permits

1
TypeDescriptionCostIssued
COM2022SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: WINDOW REPLACEMENT, REPLACE 3 EXTERIOR WINDOWS ON FRONT OF HOUSE WITH MARVIN ''ULTIMATE'' DOUBLE HUNG INSERT WITH A STONE WHITE CLAD SASH AND FINISHED WHITE PAINT INTERIOR. ADD ALUMINUM HALF SCREENS ON THE 2 TOP STORY WINDOWS. REPLACE JUST THE SASHES. BULLNOSE TRIM TO REMAIN. (REPLACEMENT WILL BE DONE WITHIN THE SAME SIZE AND LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, ****PER CHAP ATP: AS PER CHAP AUTHORIZATION TO PROCEED. • ON THE FRONT FAÇADE, REPLACE AT THE 1ST FLOOR THE EXISTING WINDOW WITH NEW MARVIN, “ULTIMATE” 48” X 65”, 8-OVER12 DOUBLE HUNG ALUMINUM CLAD WINDOW APPLIED WITH BALTIMORE BULLNOSE TRIM. WINDOW TO FIT THE EXISTING HISTORIC MASONRY OPENING WITH NO FILLER AND CHANGE IN RATIO OF SASH TO GLASS. WINDOW SASHES TO HAVE STONE WHITE ALUMINUM CLAD SASH FINISH ON EXTERIOR AND FINISHED WHITE PAINT ON THE INTERIOR. BALTIMORE BULLNOSE TRIM TO BE RETAINED. WINDOW SILL TO BE PAINTED BENJAMIN MOORE EXTERIOR WHITE-632 01. • ON THE FRONT FAÇADE, REPLACE AT THE 2ND FLOOR TWO (2) EXISTING WINDOWS WITH NEW MARVIN, “ULTIMATE” 31” X 66”, 6- OVER-6 DOUBLE HUNG ALUMINUM CLAD WINDOW APPLIED WITH BALTIMORE BULLNOSE TRIM. WINDOW TO FIT THE EXISTING HISTORIC MASONRY OPENING WITH NO FILLER AND CHANGE IN RATIO OF SASH TO GLASS. WINDOW SASHES TO HAVE STONE WHITE ALUMINUM CLAD SASH FINISH ON EXTERIOR AND FINISHED WHITE PAINT ON THE INTERIOR. BALTIMORE BULLNOSE TRIM TO BE RETAINED. • ON THE FRONT FAÇADE, REPLACE AT THE 2 ND FLOOR THE EXISTING SCREEN WITH NEW ALUMINUM SCREEN AT THE FAR-LEFT WINDOW AND INSTALL NEW ALUMINUM SCREEN AT FAR-RIGHT WINDOW. SCREENS TO BE SAME SIZE, COLOR AND LOCATION. • WINDOW SASHES TO BE REPLACED WITH WOOD IN-KIND. • WINDOW SILLS TO BE PAINTED BENJAMIN MOORE EXTERIOR WHITE-632 01. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.****$6,500Jun 22, 2022

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.