Baltimore City · 21224

4017 EASTERN AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$553,500
Land use
Commercial (C)
Year built
1900
Last sale
Oct 29, 2024

Assessment

Owner4017 EASTERN, LLC
Land useCommercial (C)
Total assessment$553,500 (cycle 2026)
Last saleOct 29, 2024
Year built1900
ZoningC-2
Vacant

Permits

17
TypeDescriptionCostIssued
USE2022USE PORTION OF THE PREMISES SUITE 103 AS BEAUTY SALON; FACIALS, EYE CARE, WAXING.Jan 10, 2023
USE2022USE PORTION AS A FLORIST SHOP.Dec 27, 2022
USE2021USE 1ST FLOOR OF THE PREMISES AS AN OFFICE SPACEJul 29, 2022
USE2021USE AS 4 DWELLING UNITS AND OFFICES.Aug 26, 2021
COM2021INSTALL BLDG FIRE ALARM SYSTEM$5,000Jul 15, 2021
COM2021INSTALL BLDG FIRE ALARM SYSTEM$1Jul 15, 2021
COM2021INSTALL (1) 800 AMPS ELECTRIC SERVICE (>600 V) AS PER CODE.$1,500Mar 22, 2021
COM2020INSTALL (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE.$2,500Nov 16, 2020
COM2020INSTALL SPRINKLER SYSTEM (83 HEADS) PER NFPA AS PER PLANS AS PER CODE.$8,300Nov 6, 2020
COM2020 Extend Original Permit.(original permit:COM2019-01334:EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2019-01334) EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. Oct 17, 2020
COM2020AMEND PERMIT: ADD ELELCTRICAL,PLUMBER, AND GAS CONTRACTOR . (ORIGINAL PERMIT:COM2019-01334:EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2019-01334) EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. May 1, 2020
COM2020AMEND PERMIT: ADD HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-01334:EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2019-01334) EXISTING 2-STORY MIDDLE OF GROUP BUILDING WITH A SECOND FLOOR INFILL ADDITION IN THE REAR, AND A THIRD FLOOR ADDITION, THE BASEMENT WILL BE USED AS STORAGE AND UTILITY SPACE, THE FIRST FLOOR WILL BE USED AS TWO COMMERCIAL UNITS; ONE STOREFRONT AND THE OTHER AS OFFICE SPACE, THE SECOND AND THIRD FLOORS WILL BOTH HOLD TWO DWELLING UNITS FOR A TOTAL OF FOUR DWELLING UNITS PER BMZA2019-31 2X12 JOISTS AND TJI 560 SERIES JOISTS WILL BE USED IN CONSTRUCTION, A CONCRETE AREA WILL BE CONSTRUCTED TO SUPPORT SECOND MEANS OF EGRESS FROM BASEMENT AS PER PLANS AS PER CODE. SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. Jan 15, 2020
COM2019existing 2-story middle of group building with a second floor infill addition in the rear, and a third floor addition, the basement will be used as storage and utility space, the first floor will be used as two commercial units; one storefront and the other as office space, the second and third floors will both hold two dwelling units for a total of four dwelling units per bmza2019-31 2x12 joists and tji 560 series joists will be used in construction, a concrete area will be constructed to support second means of egress from basement as per plans as per code. separate permits required for sprinkler and fire alarm systems. $75,000Oct 15, 2019
COM2019 extend original permit.(original permit:com2018-85079:scope of work: interior alternations: interior demolition (category i): removal of the plaster, trim, non-structural walls, flooring, doors, windows, and removal of all asssociated debris. all work will be done according to baltimore city code. demo only, separate permit will be pulled/required for interior renovations. ) original permit description:(com2018-85079) scope of work: interior alternations: interior demolition (category i): removal of the plaster, trim, non-structural walls, flooring, doors, windows, and removal of all asssociated debris. all work will be done according to baltimore city code. demo only, separate permit will be pulled/required for interior renovations. Jul 9, 2019
COM2019install (6) # plumbing fixtures, (1) # sanitary connection (reconstruction0, (1) # water service pipe (reconstruction) as per code.$1,500Apr 16, 2019
COM2019scope of work: (interior alterations) basement underpinning for existing two story center unit row home ( no change to existing building footprint) the proposed building basement height is 8'-0" (interior renovation to basement will be done under a separate permit) this permit is only for underpinning as per plans as per code. $35,000Feb 4, 2019
BMZ2019use 1st floor for commercial space. use 2nd & 3rd floors for four (4) dwelling units- 2 du's each floor.Jan 22, 2019

Violations

3
KindCategoryStatusFineBalanceDate
service_requestSW-Dirty AlleyClosed (Duplicate)Apr 1, 2026
service_requestSW-Dirty AlleyClosedMar 31, 2026
citationBC 114.14P$500$0Oct 11, 2019

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.